Laserfiche WebLink
<br />Cotzricil ~ouzzcil Prc~ie.~t Project ~-pc ~c~o9_2010 3uz~71z.~ary i~e~cr:pt~~r <br />1.anl~irzg A~ erage ~Vuzr~ber Steering <br />t1-1'l?) r`C3T11I111t~~2 <br />Atlju~ied <br />_ h;azzl~ing <br />Siempre ~Terde Park 2oo9.0t4o P 6t Replace restroom at park <br />Restroom <br />1!/~ISCezilaneous 2003.0280 PL 62 This will fund feasibility and planning studies required to carry out Council <br />Engineering Studies vision and plan for the subsequent year's C.I.P. <br />(annual) <br />Macarthur Boulevard 2004.01~o R 63 Project implements the recommendations of the Streetscape Master Plan and <br />Phase 2 Construction the completed design for enhancuzg the appearance of the street and <br />installing traffic calming measures. Phase 2 improvements are between Lewis <br />Avenue to Dutton Ave. <br />Cherzy GrOVe 2009.®0'70 P 64 Demolition of existing restroom and replacement with new structure <br />estroom <br />Bonaire Park Picnic 2009.0~0o P C5 Repair /replace cracked concrete picnic areas <br />Area Repair <br />22 5.00 Pedestrian Safety 2009.®010 R 66 Improve pedestrian safety at railroad crossing on the Niles Subdivision at <br />Improvements at Davis Street, Plesperian Bl, and Alvarado ST. by adding detectable warning <br />Railroad Crossing surfaces, ped channelization, signange, sidewalk realignment, and pedestrian <br />signals <br />Tuesda,r, March so, 20®9 Page lr of ig <br />