My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2009 0310
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2009 0310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2009 11:08:01 AM
Creation date
4/3/2009 11:07:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
3/10/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0406
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0406
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Top 1® Projects <br />Council Council Project Project type 2009_2010 Summary Description <br />Ranking Average Number Steering <br />Committee <br />Adjusted <br />Ranking <br />b 6.71 Downtown TOD park 2009.0130 P 30 -Phase 1-Master plan to study land acquisition and development of a new park <br />development -Master in the downtown TOD project area. No acquisition or construction in this phase <br />Plan <br />7 6.57 Sanitary Sewer Line 2003.1210 S 5 Pipeline replacements at various locations as identified by CCTV inspections and <br />Replacement Various maintenance records. <br />Locations <br />S 6.57 Storm Drain System 2008.0140 D 9 Inventory the City's storm drain system, prepare updated storm drain maps in <br />Inventory and Inspection the GIs system and assess condition of alf pipes and structures <br />9 6.43 East 14th Street South 2005.0100 R 12 The proposed projects consist of Phase I streetscape improvements along the <br />Area Revitalization section of East 14th Street from 136th to 145th Avenues. Proposed <br />Pro ect, Phase I improvements would consist of widening sidewalks with bulb-outs, enhancing <br />1 crosswalks, and new street trees <br />10 6.43 All Parks -Rehabilitation 2009.0060 P 20 Park pathways are in poor condition and need of rehabilitation. Anticipated <br />of Asphalt walkways work include combination of surface treatment and miB and fill <br />Page 2 of 2 <br />Tuesday, March 10, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.