Laserfiche WebLink
City Council All Selected Projects <br />Council Council Project Project type 2009_2010 Summary Description <br />Ran-king Average Number Steering. <br />Committee <br />Adjusted <br />Rankin <br />6 6.71 Downtown TOD park 2009.0130 P 30 Phase 1-Master plan to study Land acquisition and development <br />development -Master of a new park in the downtown TOD project area. No acquisition <br />Plan or construction in this phase <br />7 6.57 Sanitary Sewer Line 2003.1210 S 5 Pipeline replacements at various locations as identified by CCTV <br />Replacement Various inspections and maintenance records. <br />Locations <br />8 6.57 Starm Drain System 2008.0140 D 9 Inventory the City's storm drain. system, prepare updated storm <br />Inventory and Inspection drain maps in the GIS system and- assess condition of all pipes and <br />stcuetures <br />9 6.43 East 14th Street South 2005.0100 R 12 The proposed projects consist of Phase I streetscape <br />Area Revitalization improvements along the section of East 14th Street from 136th to <br />Project, Phase I 145th Avenues. Proposed improvements would consist of <br />widening sidewalks with bulb-outs, enhancing crosswalks, and new <br />10 6.43 All Parks -Rehabilitation 2009.0060 P 20 Park pathways are in poor condition and- need of rehabilitation. <br />of Asphalt walkways Anticipated work include combination of surface treatment and <br />mill and fill <br />Tuesday, March 10, 2009 Page 2 of 9 <br />