My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2009 0310
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2009 0310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2009 11:08:01 AM
Creation date
4/3/2009 11:07:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
3/10/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0406
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0406
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council All Selected Projects <br />Council Council Project Project type 2009_2010 Summary Description <br />Ranking Average Number Steering <br />Committee <br />Adjusted <br />Rankin <br />11 6.29 Pedestrian Accessibility 2005.0160 R 6 Construct pedestrian ramps, ADA improvements and sidewalk gap <br />Improvements (Annual) closures in various locations in the City that meet Transportation <br />Development Act (TDA) Article 3 requirements <br />12 6.14 Marina Spine Construction 2005.0030 R 21 Construction of the Spine (Ped/Bike) component of the Monarch <br />Bay /Fairway Drive Design consistent with the Marina Connection <br />Plan <br />13 6.14 Marina Park Irrigation 2003.0370 P 37 This project will replace the irrigation system at Marina Park. <br />Improvements Improvements will be compatible with the use of reclaimed water. <br />14 5.86 PWS Maintenance 2005.0150 R 3 Fund to complete mid sized repair projects $20,000 to $5D,000 <br />Projects Various Location range from a list maintained by E/T and PWS <br />(annual) <br />15 5.86 Marina Dag Park 2009.0120 P 47 Construct a dog park at the Shoreline Recreation Area south of the <br />Neptune Bridge Alternative 2 - 4" Decomposed granite used for <br />estimate <br />Tuesday, March 10, 2009 Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.