Laserfiche WebLink
4 <br />3, Electncat Permit <br />A. Issaaase-F99 change to Filing and Issuance <br />B. Plan -Check, when applicable _ _ <br />`For new Residential Construction and additions w <br />tincluded,all circuitsa service,a,nd subanels »N,, <br />Circuits. Installation replacement or alteration of <br />15 to 20 ampere circuit <br />,21 to 30 ampere circuit <br />--21 to 40 ampere circuit <br />:41 to 50 ampere circuit <br />�. <br />X51 to 70 ampere circuit <br />,71 to 100 ampere circuit <br />1101 to 200 ampere circuit <br />bOver 200 ampere capacity a <br />tracts, <br />vice or �ervlce mange. » <br />vices over 600 volts: <br />3r 200 amp, each <br />vices 600 volts or less, each <br />to X00 amp capacity-- � <br />3r 2_00 amp capacity <br />vice disconnectlna means fc <br />G:\FEES\2009-10 Feas\2009-10 Proposed Fees <br />meter <br />usat <br />ant to venous provisions of the San Leandro Municipal Code (SLMC) San Leandro Administrative Code (SLAC) or the general laws of the State of Caldomia. ............. <br />. .... <br />Current -Fee <br />ee Reference Pro sed Fees 2009-10 <br />ea, „ , „�.. Q.,a ,.. .m. ....... <br />.. ..�.»m ,. .�.��. m,.....�.� .,®. ._,e ..�.,..,......_.� . ..�.e, _.....u. .......... .,.,,. _ ........ <br />hange <br />:to $80 plus the amount shown below, for each <br />`ele to 1 R <br />'Direct Cost (1) <br />over $100 000-13 f/ oo building permit fees�� <br />.35 <br />PI 3,!j,%-$86,00 plus the amount shown below for each electrical Item <br />deletln� <br />lets, switc.he.s, receptacle and lighting rixturevs): <br />... ,.... <br />....,... <br />.. <br />CPI 311/$930 <br />CPI 3.11% -$10.10 .... <br />oa <br />CPI 3.11 / $10.40A� <br />CPI 3,11%-$11.15 <br />CP13.11 /-$12.00 <br />CPI 3.11%-$15.20 <br />CP13.11 %-$22.00 <br />'LUS $6.45 for each additional 1 GO ampere <br />or fraction thereofCPI <br />3.11 %-$22.351$6.65 <br />CPl 3.11 / _055 <br />S . <br />CP13.11% - $1.10 <br />--------- _ <br />xp <br />CPI 3.11 / - $0.80 <br />CPI 3.11 %-$27.10 <br />CPI 3.11 %-$27. i0 <br />CPI 3.11 % <br />$95.85 <br />CPI 3.11% -$32.95 <br />- <br />_ <br />CPI 3.11%-$66. 10 <br />to a m 'mum of 7$ 4.40 each <br />.n._ _ _ _ .--,.. � _ _..—. <br />CP13,11 / $5.051$76.75 <br />—.–« _.–_. <br />.. <br />indirectt costs ead and <br />c <br />7 <br />4/22./2009 <br />