LEANDRO ADMINISTRATIVE CODE FINANCE
<br />6,Chapter4�T FEES -_-
<br />arc, vibrating and electrolytic): for each kW or
<br />1 to 20
<br />51 to 86
<br />For inspection of alterations and changes in existing wiring each inspection visit
<br />Photovoltaic Fees do not include Issuino and Filino Fees. Automation fees. and
<br />,B. Plan Check, when applicable II
<br />Exemption Inspection of the installation of an earthquake gas "shutoff valve A
<br />For new Residential Construction and additions with valuations over $100,000 1
<br />includin all water in asp mt water heating and plumbio fiMures
<br />-. ,... _.., , F_P-, ..,._. - . ., .. il
<br />`,Plumbing fixture or waste discharge, each `$
<br />!Plumbing fixture removed and opening sealed each
<br />Plumbing fixture reset or set after the completion of the structure to an outlet $
<br />rou had m nor thereto each _
<br />Repair or alteration of drainage or vent piping, each 5
<br />..
<br />Inside rain leader each �
<br />--Dishwasher residential each ;5
<br />.Dishwasher -commercial, each
<br />;Garbage disposal - residential, each _�
<br />.
<br />Garbs a dis osal ecw�.. �g acommercial each $
<br />Grease interceptor, each, up to 150 gal`'��'--�-�-
<br />Grease interceptor, each, over 150 gal. _ $
<br />jlndustrlal wasteinterceptor (sand, grease, neutralizer and clarifier), each
<br />:Sewagpump ejector - residential, each a. 1
<br />Sewage ejector pump- commercial, each
<br />?Water Piping:....._...,..,,a.�,-_�..,,�.».....,-....
<br />Cura'entFeemm Reference Pra�oaedFees2009-10
<br />805 ......,.w..,
<br />CPI 3.11 %-$20.50 _ �.d.�..,,,_...a ..,....�. ,.�,�....
<br />_ ..._»„-.�,- .. . �,,.>...,.
<br />..,, ....e.�„r„ ,;,
<br />945 � ��
<br />...� .,,-.,� .......n
<br />CPI3.11%-$_51.00
<br />5.70
<br />CP13.11 %-$78.05
<br />». »..... ...w.. _ , T....... ,.........
<br />0.60
<br />CPI 3.11 %-$91.35
<br />.,....,.._mm .. ,,,,. ...... .., -._
<br />5.75
<br />.... ... .,._
<br />_,n.,.e... .......> ........ .
<br />75
<br />CPI 11%-$26.55
<br />(k00{�ldllFt89 lW4r-the-courAerplan chwk)
<br />These are now fees to be added to the }arld IssilanGe
<br />N1.gt1:; nladee 1tft, sEniCtPi heck 1 fir
<br />^
<br />tcNkei n snd i inv®itet
<br />"�
<br />fee,i1C�ft>de�1'1M�Iht.9Airtltut�lp!atii�reds.l
<br />1.05
<br />CPI 1.40
<br />&f��id6�¢i»¢StniCglF�IP�ncSi�fK, ]fir
<br />CPI 3.11 %-$8.00
<br />,c1eC1%8trcw 8rt9r
<br />a - CPI 311/ $1915 _.e . r._„ .. ....�
<br />,
<br />R,.tlt1
<br />act Cast (1) with a minimum charge of $56.00
<br />CPI3.11 %-$57.75
<br />change
<br />$86 plus the amount shown below for each
<br />,mbing item _ CPI 3.11%-$86.00 Plus the amount shown below for each plumbing Item
<br />"Oct Cost (1) _ ,-_ -_ -
<br />Delete 4.C.
<br />FAi _ R FA .a, UM $28.00 With No Filing & Issuance Fee
<br />% of the building permit fee
<br />0.30
<br />CPI 3.11 %-$10.65
<br />0 0
<br />75
<br />CPI 3.11%-$12.25
<br />Each additional opening
<br />CPI 3.11 %-$8.00
<br />1 85CPI3.11
<br />%-$12.25
<br />75
<br />CP13.11%-$8.00
<br />75
<br />CPI 3.11%-$8.00
<br />1.45
<br />CPI 3.11%-$l 1.80
<br />.75
<br />H CPI 3.11 %-$8.00
<br />1.05
<br />CPI 1.40
<br />.75
<br />CPI 3.11 %-$8.00
<br />855 ."
<br />a - CPI 311/ $1915 _.e . r._„ .. ....�
<br />,
<br />445.
<br />CPI311%-$25.20
<br />6 50
<br />CPI 3,11 %-$17.00
<br />6.25,
<br />CPI 3.11 %-$27.05
<br />Water line and first 10 openings (including water using equipment
<br />EL1.85
<br />CPI 3.11%-$12.25
<br />Each additional opening
<br />b 1.55 .�,.
<br />m
<br />CP13.11%-$1.60
<br />.,.. „
<br />w M_,
<br />Installation replacement or abandonment of water service, each
<br />,
<br />111.85
<br />.wu
<br />CP13.11 %-$12.25
<br />Irrigation sprinkler system and first 20 heads24.45
<br />CPI 3.11%-$25.20
<br />Each dhdo.ituiortyna.
<br />he_er.sa_od..f_o_r
<br />_
<br />.o5v0-eer
<br />__
<br />pl .
<br />r hea and Indirect costs
<br />Direct Coat -a_h_i.ng..�benefits,ndlrecfcosts
<br />GiFEES2009-10 Fees�2009-10 Proposed Fees
<br />41222009
<br />
|