Laserfiche WebLink
RATIVE CODE <br />Fee change to Filing and Issuance Fee <br />rcontract price of the sign. In the event such a cost or price is not available or <br />'does not, in the opinion of the Building Official, fairly represent the true value of <br />the sign, the valuation shall be based on a reasonable cost estimate established <br />b the Buildln Offiaal <br />$100 or less <br />More than $100 through $750 <br />;More than $750 through $1,000 <br />More than $5,000 through $20 OOOP „ ... ...,„ ._ .�..., ,...,..��,,.„. <br />..... .... ... ......... .... „. - <br />-More than $20 <br />.Plan Check, when applicable <br />Electric self-contained signs initially installed bearing Underwriters' label of <br />a rovel each <br />Relocation or alteration of any sign electronically or mechanically, but not <br />including replacement of tubing, transformers and such parts subject to <br />failure; or shop inspection by the local inspection department in lieu of a UL <br />label (a local electrical inspection department label of approval shall be <br />each,, ,r ' <br />Tube lighting for illumination display or outline <br />.� Incandescent lamos for illumination, disolav or outline liahtina havino sign <br />131FEE912009-10 Fees12009-10 Proposed Fees <br />CP1 3.11%-$20.75 <br />CP13.11%-$24.95 <br />CP13.11 %-$24.951$13.30 <br />CPI 3.1111-$78.151$10.85 <br />for the first $20,000 plus $9.48 for each <br />$1 r000 or Gachon thereof CPI 3.11%-$ 0 951$9 80 <br />ign Permit Fee <br />CPI 3.11%-$25.45 <br />2,10 per sign plus $2.30 for each receptacle <br />2_iQ per sign plus $0.50 for each receptacle <br />13 <br />CP13.11%-$25.45 <br />CPI3.11%-$12.50/$2.40 <br />CPI 3.11 %-$12.50/$0.55 <br />CP13.11%-$16.45 <br />4/22/2009 <br />