6, Chapter 4
<br />100FEES� The
<br />have been established by the City Council
<br />FINANCE
<br />FEES
<br />n[ to various
<br />of the
<br />Y AutiiTYA i AP# 1 rl PMl7nf 1 1 , of P?lans and Specific-at,ions t�uaAaRooiO;
<br />Seengmeerng& Tr�ansportation
<br />Department Item 9, �
<br />;Public Work Projects
<br />Building Permit
<br />..�.,..,.-.�.,w...,,... � ,...� _-,... �.,-�-»....w.�
<br />>NOTE: FEES FOR BUILDING PERMITS AND TERMITE REPAIR WORK DO NOT INCLUDE THE STRONG MOTION (EARTHQUAKE) INSTRU MENTATIC
<br />!p. Issuance Fae change to Filing end lasuance Fee
<br />Yaluatiep'change to $86 plus valuation fees and/or
<br />r building as listed below _
<br />"R6aCFt,t68U '770t AffttuM�Ffartm�mence""p`-`
<br />a ,,,„;�r+d r, Basut�riikat Ea�lan dhecical ih6 S�tFrrs �� <
<br />Minimum fee for one inspection _ Included in the Issue and Filing Fee
<br />............
<br />_
<br />Building Permits requiring more than one inspection, other than for those $ 27.00
<br />requiring return inspections for corrections from a previous inspection, have a
<br />minimum tee of: F __
<br />All-inclusive Permit Work involving a combination of building and/or 'One filing and issuance fee plus Items from
<br />mechanical, electrical and plumbing, with a value of less than $3,000: "!respective fee tables
<br />'(Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent with this fee schedule.)
<br />Total Valuation (Based on total value of all construction work, as determined by the
<br />Building Official, including all finish work, roofing, electrical, plumbing, heating, air
<br />conditioning, elevators, fire-edinguishing systems and any other permanent i
<br />arnnnmantl I
<br />ar+d fft Paoµ
<br />;i $70Qorti'3Et�14thamd
<br />Fees aoo9-10
<br />�ffd �,�%c.¢: �
<br />, CPI 3.11% $6.62
<br />� ._, �-
<br />Ow plusJ=todadh
<br />� .-,�-
<br />halon itieTWT to and
<br />tCP13.11%-$99.00/$12,91
<br />MOM "an for
<br />Racllon thereof, to and
<br />IR
<br />CPI 3.11%-5719.001$9. 00
<br />_
<br />p[tr$YareacM ;
<br />fmcOW ftritot, to and
<br />CP13.11%-$117070.00/$5,,16 _
<br />� 5600.00O,pius oC 6aot1
<br />�
<br />._ _ —.._ ,.T :T. �_, _................__...
<br />.,, ..-
<br />iher�,��
<br />� ..........
<br />CP13 11 / $3232.00/
<br />$4.84
<br />01,6N10,t�QO pias 83.99 for
<br />GifS 40r tY&sileiotr�
<br />CPI 3.11 / _-,$5750.001$4 00
<br />, _
<br />is ftsted stun® ;
<br />—
<br />&13.11 %- $86.00
<br />CPI 3.11%-$131.00
<br />_
<br />tfhgp6nn, rrgninn6i -4„_,
<br />CP1 3.11%-$131.00
<br />G:TEES12009-10 Feest2009-10 Proposed Fees 5 4,122/2009
<br />
|