Laserfiche WebLink
Resolution No. 2009- <br />Attachment B <br />Page 1 of 1 <br />TDA Article 3 Project Application Form <br />Fiscal Year of this Claim 09110 Applicant: Cit~of San Leandro <br />Contact person Keith R Cooke <br />Mailing Address $35 East 14th Street San Leandro CA 94577 <br />E-Mail Address kcooke a(~ci.san-leandro.ca.us Telephone: (510) 577-3439 <br />Secondary Contact (in event primary not available) Tara Peterson <br />E-Mail Address tpeterson(cilci san-leandro ca us Telephone (510) 577-3432 <br />Short Title Description of Proiect• Citywide Pedestrian Improvements <br />Amount of claim $52 640 <br />Functional Description of Project: <br />Proiect will provide for the design construction and inspection of curb ramps sidewalk bulb•outs in-pavement lighted crosswalk pedestrian safety <br />signag_e accessible pedestrian traffic signal equipment and sidewalks at various locations throughout City <br />Financial Plan: <br />List the project elements for which TDA funding is being requested (e.g., planning, environmental, engineering, right-of-way, construction, <br />inspection, contingency, audit). Use the table below to show the project budget. Include prior and proposed future funding of the project. If the <br />project is a segment of a larger project, include prior and proposed funding sources for the other segments. <br />Proiect Elements: Engineering Construction and Inspection <br />Fundin Source All Prior FYs Application FY Next FY Following FYs Totals <br />TDA Article 3 $52,640 $52,640 <br />list all other sources: <br />1. <br />2. <br />3. <br />4. <br />Totals <br />Project Eligibility: YES?INO? <br />A. Has the project been approved by the claimant's governing body? (If "N0," provide the approximate date approval is <br />anticipated). Yes <br />B. Has this project previously received TDA Article 3 funding? If "YES," provide an explanation on a separate page. No <br />C. For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter 1000 of the California <br />Highway Design Manual? (Available on the Internet via: http:!lwww.dot.ca.gov). NIA <br />D. Has the project been reviewed by a Bicycle Advisory Committee? (If "N0," provide an explanation). N/A <br />E. Has the public availability of the environmental compliance documentation for the project (pursuant to CEQA) been <br />evidenced by the dated stamping of the document by the county clerk or county recorder? (required only for projects that <br />include construction). N/A <br />F. Will the project be completed before the allocation expires? Enter the anticipated completion date of project (month and <br />year) June 2011 Yes <br /> <br />G. Have provisions been made by the claimant to maintain the project or facility, or has the claimant arranged for such <br />maintenance by another agency? (If an agency other than the Claimant is to maintain the facility provide its name: <br />1 Yes <br />K:\AA-C\COUNCIL\2009\5 MAY 04WITC TDA FY 09-10 ATTACH B.doc <br />