<br />of s~+ t~~o
<br />~ o ~~.,,,
<br />
<br />~~""":cr~ `
<br />, ..
<br />_
<br />~~ ~~.~,,, s~ .anoiv-~`
<br />~~ ~,
<br />PROJECT TITLE: Bay Trail Stough Bridge
<br />PROJECT NO.: 144-39-012
<br />BID NO.: 08-09.016
<br />BID OPENING
<br />DATE: Tuesday, April 7, 2009
<br />TIME: 3:00 PM
<br />LOCATION: City Clerk
<br />ITEM
<br />NO.
<br />21
<br />22
<br />23
<br />24
<br />25
<br />26
<br />27
<br />28
<br />29
<br />30
<br />31
<br />32
<br />33
<br />34
<br />35
<br />36
<br />37
<br />38
<br />39
<br />QUANTITY ITEM
<br />13 CY Structure Backfill (Bridge {FQ})
<br />6 EA Furnish Pre-stressed Concrete
<br /> Pile
<br />6 EA Drive Pre-Stressed Concrete
<br /> Pile
<br />3 EA Fumish CISS Pile
<br />3 EA Drive CISS Pile
<br />39 CY Structural Concrete (Bridge)
<br />5,238 LB Bar Reinforcing Steel (Bridge)
<br />4 EA Furnish Steel Truss
<br />4 EA Erect Steel Truss
<br />60 CY Lightweight Concrete Deck
<br />337 CY Structure Excavation (Soldier
<br /> Pile Wall {FQ})
<br />337 CY Structure Backfill (Soldier Pile
<br /> Wall {FO})
<br />1,654 LF 24" Drilled Hole
<br />158 CY Concrete Backfill
<br />36 CY . Controlled Low Strength
<br /> Material
<br />2,194 LF Steel Soldier Pile
<br />60 CY Timber Lagging
<br />1 LS Clean & Paint Steel Soldier Pile
<br />588 LF Chain-link Fence (4')
<br />TOTAL BASE BID
<br />
<br />ENGINEER'S ESTIMATE Precision Engineering, Inc. McGuire and Hester
<br />Date Approved: 2/11/2009 92 Natomas Street 9009 Railroad Avenue
<br />Prepared by: JO San Francisco, CA 94105 Oakland, CA 94603
<br /> Phone: 415-621-4882 Phone:510-632-7676
<br /> Fax: 415-621-4812 Fax:510-562-5209
<br />UNIT COST ITEM COST UNIT COST ITEM COST
<br />$110.00 $1,430.00 a-= 8T4~~~ $~ , OU~~~~`
<br />$1,670.00 $10,020.00 51883. 3; -.~8i
<br />~
<br />
<br />
<br />$2,400.00
<br />
<br />$14,400.00
<br />
<br />$3,316.67 ,
<br />m~~~
<br />$19,900.02
<br />$80,000.00 $240,000.00 ~5,86v X67 -;=$ .40;600 01'
<br />$97,000.00 $291,000.00 33.$425;=t99?t99
<br />$975.00- $38,025.00 $ 4~6.4*1 ~"`~$9~y;795~99
<br />$2.00 $10,476.00 0~ 68
<br />$145,000.00 $580,000.00 $80,750.00 $323,000.00
<br />$14,500.00 $58,000.00 $16,200.00 $64,800.00
<br />$675-00 $40,500.00 - .3 9~- -=$0
<br />$116.00 $39,092.00 ~$1 ~8ti ~ 56~
<br /> 'h;
<br />$104.00 $35,048.00 .~; $33 2~ 8~
<br />~,
<br /> i ~
<br />$50.00 $82,700.00 :13~ $u ~t~,1~5' 4
<br />$610.00 $96,380.00
<br />~ .8
<br />$550.00 $19,800AO $350.00 $12,600.00
<br />$183.00 $401,502.00 $4. ~ . " 8~
<br />$1,830.00 $109,800.00 $ 79
<br />$14,500.00 $14,500.00 $23,200.00 $23,200.00
<br />$18.00 $10,584.00 . ;$; ~ ._ _ _~~;;
<br />$2,563,500.00
<br />UNIT COST I ITEM COST
<br />$650.00 $8,450.00
<br />$1,922.00 $11,532.00
<br />$3,720.00 $22,320.00
<br />$30,000.00 $90,000.00
<br />$178,000.00 $534,000.00
<br />$1,750.00 $68,250.00
<br />$1.80 $9,428.40
<br />$91,000.00 $364,000.00
<br />$15,000.00 $60,000.00
<br />$534.00 $32,040.00
<br />$30.00 $10,110.00
<br />$74.00 $24,938.00
<br />$44.00 $72,776.00
<br />$360.00 $56,880.00
<br />$315.00 $11,340.00
<br />$55.00 $120,670.00
<br />$834.00 $50,040.00
<br />$26,000.00 $26,000.00
<br />$29.00 $17,052.00
<br />$1,977,549.90
<br />Gordon N. Ball, Inc.
<br />333 Camille Avenue
<br />Alamo, CA 94507
<br />Phone: 925-838 -5675
<br />Fax: 925-838-5915
<br />
<br />UNIT COST ITEM COST
<br />$100.00 $1,300.00
<br />$2,000.00 $12,000.00
<br />$5,000,00 $30,000.00
<br />$41,000.00 $123,000.00
<br />$165,000.00 $495,000.00
<br />$3,000.00 $117,000.00
<br />$1.50 $7,857.00
<br />$62,000.00 $248,000.00
<br />$20,000.00 $80,000.00
<br />$500.00 $30,000.00
<br />$50.00 $16,850.00
<br />$30.00 $10,110.00
<br />$100.00 $165,400.00
<br />$170.00 $26,860.00
<br />$150.00 $5,400.00
<br />$38.00 $83,372.00
<br />$1,000.00 $60,000.00
<br />$40,000.00 $40,000.00
<br />$50.00 $29,400.00
<br />$2,024,427.20
<br />Bid Summary-Bay Trail Slough Bridge (2j.xlsx Page B of 15 Printed 4/16/2009 @ 4:16 PM
<br />
|