Laserfiche WebLink
<br />of s~+ t~~o <br />~ o ~~.,,, <br /> <br />~~""":cr~ ` <br />, .. <br />_ <br />~~ ~~.~,,, s~ .anoiv-~` <br />~~ ~, <br />PROJECT TITLE: Bay Trail Stough Bridge <br />PROJECT NO.: 144-39-012 <br />BID NO.: 08-09.016 <br />BID OPENING <br />DATE: Tuesday, April 7, 2009 <br />TIME: 3:00 PM <br />LOCATION: City Clerk <br />ITEM <br />NO. <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />QUANTITY ITEM <br />13 CY Structure Backfill (Bridge {FQ}) <br />6 EA Furnish Pre-stressed Concrete <br /> Pile <br />6 EA Drive Pre-Stressed Concrete <br /> Pile <br />3 EA Fumish CISS Pile <br />3 EA Drive CISS Pile <br />39 CY Structural Concrete (Bridge) <br />5,238 LB Bar Reinforcing Steel (Bridge) <br />4 EA Furnish Steel Truss <br />4 EA Erect Steel Truss <br />60 CY Lightweight Concrete Deck <br />337 CY Structure Excavation (Soldier <br /> Pile Wall {FQ}) <br />337 CY Structure Backfill (Soldier Pile <br /> Wall {FO}) <br />1,654 LF 24" Drilled Hole <br />158 CY Concrete Backfill <br />36 CY . Controlled Low Strength <br /> Material <br />2,194 LF Steel Soldier Pile <br />60 CY Timber Lagging <br />1 LS Clean & Paint Steel Soldier Pile <br />588 LF Chain-link Fence (4') <br />TOTAL BASE BID <br /> <br />ENGINEER'S ESTIMATE Precision Engineering, Inc. McGuire and Hester <br />Date Approved: 2/11/2009 92 Natomas Street 9009 Railroad Avenue <br />Prepared by: JO San Francisco, CA 94105 Oakland, CA 94603 <br /> Phone: 415-621-4882 Phone:510-632-7676 <br /> Fax: 415-621-4812 Fax:510-562-5209 <br />UNIT COST ITEM COST UNIT COST ITEM COST <br />$110.00 $1,430.00 a-= 8T4~~~ $~ , OU~~~~` <br />$1,670.00 $10,020.00 51883. 3; -.~8i <br />~ <br /> <br /> <br />$2,400.00 <br /> <br />$14,400.00 <br /> <br />$3,316.67 , <br />m~~~ <br />$19,900.02 <br />$80,000.00 $240,000.00 ~5,86v X67 -;=$ .40;600 01' <br />$97,000.00 $291,000.00 33.$425;=t99?t99 <br />$975.00- $38,025.00 $ 4~6.4*1 ~"`~$9~y;795~99 <br />$2.00 $10,476.00 0~ 68 <br />$145,000.00 $580,000.00 $80,750.00 $323,000.00 <br />$14,500.00 $58,000.00 $16,200.00 $64,800.00 <br />$675-00 $40,500.00 - .3 9~- -=$0 <br />$116.00 $39,092.00 ~$1 ~8ti ~ 56~ <br /> 'h; <br />$104.00 $35,048.00 .~; $33 2~ 8~ <br />~, <br /> i ~ <br />$50.00 $82,700.00 :13~ $u ~t~,1~5' 4 <br />$610.00 $96,380.00 <br />~ .8 <br />$550.00 $19,800AO $350.00 $12,600.00 <br />$183.00 $401,502.00 $4. ~ . " 8~ <br />$1,830.00 $109,800.00 $ 79 <br />$14,500.00 $14,500.00 $23,200.00 $23,200.00 <br />$18.00 $10,584.00 . ;$; ~ ._ _ _~~;; <br />$2,563,500.00 <br />UNIT COST I ITEM COST <br />$650.00 $8,450.00 <br />$1,922.00 $11,532.00 <br />$3,720.00 $22,320.00 <br />$30,000.00 $90,000.00 <br />$178,000.00 $534,000.00 <br />$1,750.00 $68,250.00 <br />$1.80 $9,428.40 <br />$91,000.00 $364,000.00 <br />$15,000.00 $60,000.00 <br />$534.00 $32,040.00 <br />$30.00 $10,110.00 <br />$74.00 $24,938.00 <br />$44.00 $72,776.00 <br />$360.00 $56,880.00 <br />$315.00 $11,340.00 <br />$55.00 $120,670.00 <br />$834.00 $50,040.00 <br />$26,000.00 $26,000.00 <br />$29.00 $17,052.00 <br />$1,977,549.90 <br />Gordon N. Ball, Inc. <br />333 Camille Avenue <br />Alamo, CA 94507 <br />Phone: 925-838 -5675 <br />Fax: 925-838-5915 <br /> <br />UNIT COST ITEM COST <br />$100.00 $1,300.00 <br />$2,000.00 $12,000.00 <br />$5,000,00 $30,000.00 <br />$41,000.00 $123,000.00 <br />$165,000.00 $495,000.00 <br />$3,000.00 $117,000.00 <br />$1.50 $7,857.00 <br />$62,000.00 $248,000.00 <br />$20,000.00 $80,000.00 <br />$500.00 $30,000.00 <br />$50.00 $16,850.00 <br />$30.00 $10,110.00 <br />$100.00 $165,400.00 <br />$170.00 $26,860.00 <br />$150.00 $5,400.00 <br />$38.00 $83,372.00 <br />$1,000.00 $60,000.00 <br />$40,000.00 $40,000.00 <br />$50.00 $29,400.00 <br />$2,024,427.20 <br />Bid Summary-Bay Trail Slough Bridge (2j.xlsx Page B of 15 Printed 4/16/2009 @ 4:16 PM <br />