|
i° do ~~.~ ://:~P ; ~, '~ ,
<br />y O I ~ fi' ~tlem WEER/N ~°- ~~~ 1
<br />wt P V-' ahn °~
<br />t ~ N PQRI.~1 r~
<br />PROJECT TITLE: Bay Trail Slough Bridge
<br />PROJECT NO.: 144-39-012
<br />BID NO.: 08-09.016
<br />
<br />BID OPENING ENGINEER'S ESTIMATE Flatiron West, Inc. Dutra Constuction, In,c.
<br />DATE: Tuesday, April 7, 2009 ~ Date Approved: 2/11/2009 2100 Goodyear Road 2350 Kerner Bivd., Ste. 200
<br />TIME: 3:00 PM Prepared by: JO Benicia, CA 94510 San Rafael, CA 94901
<br />tOCATION: City Clerk Phone: 707-742-6000 Phone: 415-258-6876
<br /> Fax:707-746-0849 Fax: 415-459-3295
<br />ITEM
<br />NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST
<br />21 13 CY Structure Backfill (Bridge {FQ}) $110.00 $1,430.00 $400.00 $5,200.00 $1,200.00 $15,600.00
<br />22 6 EA Furnish Pre-stressed Concrete $1,670.00 $10,020.00 $1,900.00 $11,400.00 $4,480.00 $26,880.00
<br /> Pile
<br />23 6 EA Drive Pre-Stressed Concrete $2,400.00 $14,400.00 $4,000.00 $24,000.00 $8,910.00 $53,460.00
<br /> Pile
<br />24 3 EA Furnish CISS Pile $80,000.00 $240,000.00 $28,000.00 $84,000.00 $34,000.00 $102,000.00
<br />25 3 EA Drive CISS Pile $97,000.00 $291,000.00 $24,000.00 $72,000.00 $120,000.00 $360,000.00
<br />26 39 CY Structural Concrete (Bridge) $975.00 $38,025.00 $18,000.00 $702.000.00 $4,800.00 $187,200.00
<br />27 5,238 LB Bar Reinforcing Steel (Bridge) $2.00 $10,476.00 $2.00 $10,476.00 $3.00 $15,714.00
<br />28 4 EA Fumish Steel Truss $145,000.00 $580,000.00 $122,000.00 $488,000.00 $71,000.00 $284,000.00
<br />29 4 FJ> Erect Steel Truss $14,500.00 $58,000.00 $8,000.00 $32,000.00 $6,250.00 $25,000.00
<br />30 60 CY Lightweight Concrete Deck $675.00 $40,500.00 $500.00 $30,000.00 $680.00 $40,800.00
<br />31 337 CY Structure Excavation (Soldier $116.00 $39,092.00 $80.00 $26,960.00 $190.00 $64,030.00
<br /> Pile Wall {FQ})
<br />32 337 CY Structure Backfill (Soldier Pile $104.00 $35,048.00 $90.00 $30,330.00 $200.00 $67,400.00
<br /> Wall {FQ}}
<br />33 1,654 LF 24" Drilled Hole $50.00 $82,700.00 -$40.00 $66,160.00 $106.00 $175,324.00
<br />34 158 CY Concrete Backfill $610.00 $96,380.00 $260.00 $41,080.00 $480.00 $75,840.00
<br />35 36 CY Controlled Low Strength $550.00 $19,800.00 $170.00 $6,120.00 $328.00 $11,808.00
<br /> Material
<br />36 2,194 LF Steel Soldier Pile $183.00 $401,502.00 $48.00 $105,312.00 $70.00 $153,580.00
<br />37 60 CY Timber Lagging $1,830.00 $109,800.00 $800.00 $48,000.00 $870.00 $52,200.00
<br />38 1 tS Clean & Paint Steel Soldier Pile $14,500.00 $14,500.00 $15,000.00 $15,000.00 $16,000.00 $16,000.00
<br />39 588 LF Chain-link Fence (4'} $18.00 $10,584.00 $25.00 $14,700.00 $28.00 $16,464.00
<br />TOTAL BASE BID: $2,563,500.00 $2,230,485.75 $2,372,962.00
<br />Bid Summary -Bay Trail Slough Bridge (2}.xisx Page i4 of 15 Printed 4/16/2009 @ 4:18 PM
<br />
|