Laserfiche WebLink
E; ".i : r; <br />PROJECT TITLE: Bay Trail Slough Bridge <br />PROJECT NO.: 144-39-012 <br />RIf1 Nn • ns_na n~~ <br /> <br />BID OPENING ENGINEER'S ESTIMATE Robert A. Bothman, Inc. Valentine Corporation William P. Young Construction <br />DATE: Tuesday, April 7, 2009 Date Approved: 2/11/2009 650 Quinn Avenue P.O. Box 9337 1777 Neptune Drive <br />TIME: 3:00 PM Prepared by: JO San Jose, CA 95112 San Rafael, CA 94912 San Leandro, CA 94577 <br />LOCATION: City Clerk Phone: 408-279-2277 Phone: 41553-3732 Phone: 510-351-7004 <br /> Fax:408-279-2286 Fax: 415-457-5820 Fax: 510-351-8102 <br />ITEM <br />NO. QUANTITY ITEM UNlT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br />21 13 CY Structure Backfill (Bridge {FQ}) $110.00 $1,430.00 $134.00 $1,742.00 $270.00 $3,510.00 $220.00 $2,860.00 <br />22 6 EA Furnish Pre-stressed Concrete $1,670.00 $10,020.00 $1,900.00 $11,400.00 $2,150.00 $12,900.00 $1,700.00 $10,200.00 <br /> Pile <br />23 6 EA Drive Pre-Stressed Concrete $2,400.00 $14,400.00 $3,300.00 $19,800.00 $4,260.00 $25,560.00 $3,000.00 $18,000.00 <br /> Pile , <br />24 3 EA Fumish CISS Pile $80,000.00 $240,000.00 $31,000.00 $93,000.00 $47,000.00 $141,000.00 $28,000.00 $84,000.00 <br />25 3 EA Drive CISS Pile $97,000.00 $291,000.00 $130,000.00 $390,000.00 $165,000.00 $495,000.00 $129,000.00 $387,000.00 <br />26 39 CY Structural Concrete (Bridge) $975.00 $38,025.00 $1,000.00 $39,000.00 $1,300.00 $50,700.00 $3,700.00 $144,300.00 <br />27 5,238 LB Bar Reinforcing Steel (Bridge) $2.00 $10,476.00 $1.60 $8,380.80 $1.50 $7,857.00 $2.00 $10,476.00 <br />28 4 EA Furnish Steel Truss $145,000.00 $580,000.00 $94,000.00 $376,000.00 $70,000.00 $280,000.00 $65,000.00 $260,000.00 <br />29 4 EA Erect Steel Truss $14,500.00 $58,000.00 $19,000.00 $76,000.00 $6,000.00 $24,000.00 $11,100.00 $44,400.00 <br />30 60 CY Lightweight Concrete Deck $675.00 $40,500.00 $300.00 $18,000.00 $590.00 $35,400.00 $900.00 $54,000.00 <br />3.1 337 CY Structure Excavation (Soldier $116.00 $39,092.00 $16.00 $5,392.00 $70.00 $23,590.00 $25.00 $8,425.00 <br /> Pile Wall {FQ}) <br />32 337 CY Structure Backfill (Soldier Pile $104.00 $35,048.00 $33.00 $11,121.00 $57.00 $19,209.00 $70.00 $23,590.00 <br /> Wall {FQ}) <br />33 1,654 LF 24" Drilled Hole $50.00 $82,700.00 $40.00 $66,160.00 $91.00 $150,514.00 $65.00 $107,510.00 <br />34 158 CY Concrete Backfill $610.00 $96,380.00 $460.00 $72,680.00 $405.00 $63,990.00 $572.00 $90,376.00 <br />35 36 CY Controlled Low Strength $550.00 $19,800.00 $340.00 $12,240.00 $348.00 $12,528.00 $103.00 $3,708.00 <br /> Material <br />36 2,194 LF Steel SoldierPite $183.00 $401,502.00 $40.00 $87,760-00 $47.00 $103,118.00 $55.00 $120,670.00 <br />37 60 CY Timber Lagging $1,830.00 $109,800.00 $420.00 $25,200.00 ~ $850.00 $51,000.00 $1,393.00 $83,580.00 <br />38 1 LS Clean 8~ Paint Steel Soldier Pile $14,500.00 $14,500.00 $30,200.00 $30,200.00 $27,000.00 $27,000.00 $45,000.00 $45,000.00 <br />39 588 LF Chain-link Fence (4') $18.00 $10,584.00 $28.00 . $16,464.00 $31.00 $18,228.00 $28.00 $16,464.00 <br />TOTAL BASE BID: $2,563,500.00 $1,829,400.00 ~~ti' ~~ ,3 "" $1,855,193.00 <br />Bid Summary -bay Trail Slough Bridge (2).xfsx Page 5 of 15 Printed 4116!2009 @ 4a8 PM <br />