My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2009 0414
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2009 0414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:57:57 AM
Creation date
5/1/2009 11:19:26 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
4/14/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0504
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0504
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facilities & Transportation Committee Meeting <br />April 14, 2009 <br />Project Updates <br />Facilities and Transportation Committee <br />4/14/09 <br />Downtown Lighting & Pedestrian <br />Improvements <br />Walk construction continues <br />at Estudillo and along parking <br />03al <br />area west of Buffet Fortuna <br />•New lighting standards being <br />installed throughout project <br />PG&E continues to be the <br />largest coordination <br />challenge <br />Completion estimated for <br />July 2009 <br />1 Project Updates <br />Senior Center <br />• % floor slab complete <br />• Remainder of floor to be poured week of 4/13 <br />• Parking lot curbs completed <br />• Structural steel framing arriving at site <br />• Frame erection tog, <br />begin when floor <br />complete <br />WPCP <br />Waste Activated Sludge Thickening <br />-Unused tank being rehabilitated and modified <br />prior to equipment installation <br />-project completion estimated for January 2010 <br />Upcoming <br />• Washington Avenue / 1880 Interchange AC7•/A <br />— Preconstruction Meeting held 4/8/09 <br />— Public Information Meeting 4/30/09 <br />— Project Construction Start 5/4/09 <br />— Completion Spring 2010 <br />• 262 Davis St. Demolition (former Chamber Building) <br />— 18 bids received - low bid $34,476.50 <br />— Work to start approximately June 2009 <br />• Bay Trail Bridge <br />— Bids opened at 3:00 today <br />Annual Street Overlay Rehabilitation <br />08-09 <br />• Contains Federal Stimulus Funded street work <br />• San Leandro is one of four cities in Alameda County to be <br />"shovel ready" as of this date <br />• <br />Awa itingfinaIfundingapp rovalfro mCaltransbefore <br />bidding <br />• Newly issued DBE requirements incorporated into project <br />• Street work planned on portions of: <br />— Dolores Avenue <br />— Montague Avenue <br />— Aladdin Avenue* <br />— Zelma Street <br />— Washington Avenue * (* ARRA funded) <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.