Laserfiche WebLink
6,W LE,4NDR0 ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FEES a..b= <br />§,.6.4100 a—bliis—h-ed .:by ,the-C.ty C_cil'p <br />u—rs`ua.n`t``o -v'an„ous-—provis,.o.n.—s ..o.f— tit_e .S..an Leandro Municipal Code (SLMC) San Leandro Admimstrahve Code (SLAC) _ <br />or the general laws of the State of California. <br />Description � r Current Fee ��� Reference Proposed Fees 2009.10 - <br />Dish Antenna <br />(Limited to work without framing changes.) <br />-E Plan Checking <br />Plan checking fee shall be paid at the time of application for a building permit. <br />The plan checking fee is in addition to the building permit fee and shall be as <br />follows: <br />(1) In-house- During Regular_W_ork_ina Hours <br />For Master Plans (i.e identical buildings built by the same builder <br />on the same lot or in the same tract and for which building permits <br />are issues at the same time): <br />T Changes, revisions, or additions to plans previously checked. <br />Outside plan checking services as utilized at discretion of Building <br />� <br />Official. _ <br />(2) In-house - Outside of Normal Business Hours When Requested by <br />'Applicant <br />p (3) By Outside Consultant. W hen Requested by Applicant <br />(4) Over the Counter for Small Chances. Revisions or Additions When ���� <br />Re u t d b licant <br />.,,. <br />(6) Phased Plan check- when the foundation or another part of the <br />building needs approval and permit Issuance prior to the whole building <br />(7) Energy Conservation: for all buildings subject to the California Energy <br />Commission's conservation re ulations <br />(i) Direct Cost hourly personnel charge plus a factor of 100% for hinge banal <br />127.00 <br />drtional bath remodel when concurrent with F <br />or bath remodel within the same structure <br />6 of the building perm t fee <br />II plan checking—fee shall be paid for each Master <br />i when more than one building will be built and one f <br />(60%) of the full plan checking fee shall be paid for <br />i bulldinq at time of aoolication. <br />same as tot In-house- Durino Heaular Working <br />d2u,._ <br />rs <br />Same as for In-house- During Regular Working <br />Hours PLUS overtime and overhead charges <br />Equal to In-house - During Reouiar Working Hours <br />PLUS Consultant's fee as established by <br />Agreement (contract) between City and Consultant <br />Direct <br />One and One-half (1.1/2) times the full plan <br />check fee for the entire building <br />20%of Budding Permits <br />ts, overhead and Indirect costs <br />11 %-5131.00 <br />CPI 3.11%-$328.00 <br />CPI 3.11%-$136.00 <br />Added Fee <br />