Laserfiche WebLink
SAN LEANDR` . a �. �,._ -,.... <br />O ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FEES <br />...._,.._._'s --h, ,.,u . <br />§ 6.4.100 FEES The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC) San Leandro Administrative Code (SLAC) or the general laws o1 the State of Cal iornia <br />s Descrl ion Current Fee 1 Reference Proposed Fees 2009-10 <br />(Continued) <br />9 ( ) <br />4'Oiu" bi Pg <br />(it <br />Piping Continued <br />Installation alteration or repair of water piping and/or water treating or $$11.05 <br />usin�egwpment each <br />� a ., ....,�.�.. ,.,m..�.w....� <br />CP1311%-$1225 <br />`Water Heaters (gas or electric): <br />- Under 90 gallons, each 35. <br />CPI 3.11%-$36.10 <br />Over 90 gallons, each 69.80 <br />_ -- <br />CPI 3.1146$72 00 <br />"P Tal ._ ,_ _---.m_ _ <br />T 8 P valve, each ;N/C <br />l <br />� <Flues <br />Minimum one or two flues <br />) � <br />CPI 3.11 %-$9.85 <br />Each flue over two (each) $5 90 <br />fl over o(eachv <br />CPI 3.11% $6 10 (to make it the same as in mechanical) <br />:Vacuum Breakers or Back-flow Devices <br />_..__.. ...e <br />Four or less 9.55 <br />. _._�.. .ip___._�� <br />CPI 3.1146$9.85 <br />Each additional <br />CPI 311%-$270 <br />Swimming Pools: <br />Private each 7 60 <br />CPI 3.11%-$74.85 <br />Public, each 120 75 <br />CPI 3.11%-$124.50 <br />In -ground spas, hot tubs and portable hot tubs 472.60 <br />CP13.11 x$74.85 <br />Sewers and Storm Drains. <br />— _ <br />orm drain or buildingsewer ep <br />Str 100 feet or fraction thereof +$18 55 <br />CPI 3.11%-$19.15 <br />Building aconnection lateral,I 27..3 0 <br />otcomplete, <br />_CPI 3.11 %-$28.15 <br />Buildingrainwater drain systems, comple e,c-$35,00 <br />��...nH $35, <br />CPI 311%-$3610-r <br />Septic tank outfit complete, each 454.85 <br />CPI 3.11%-$56.55 <br />Sewer extension, each <br />�. 4._,.,. m.. <br />CPI 3.11%-$19.15 <br />Site sewer lateral between building and street main new or repairs or .$35 00 <br />.._-..n._r_.. <br />m abandonment . <br />CPI 3.11 %-$36.10 <br />n "v-, ��. h <br />Temporary privy or vault (chemical toilet) each 15. <br />m. . <br />CPI 3,11%-$16.45 <br />Gas Piping and Oil Piping: <br />Minimum Fee (one or two outlets) $6 45 <br />.r ... <br />CPI 3.11%-$6.65 <br />C ,. <br />:Exam I nostallation of an earth <br />p Inspection <br />pethe quake gas shutoff valve 'No minimum gas piping and oil piping fee <br />Each as outlet over $3 80 <br />CPI 3.11%-$3.70 <br />Each gas meter over one (same time and place) 4 65 <br />a <br />CPI 3.11%-$4.80 <br />Gas line test, each test 12 <br />m. m �� _ 3� <br />CP13 11 %-$13 30 <br />1 <br />o.� .. u,.e. �® <br />Fuel oil or liquefied petroleum gas storage tanks, demolition of new tanks i 6. 5 <br />m_ <br />and piping to buildin ,each �y <br />CPI 3.11%-$7.20 <br />Clothes dryer - residential, each �$8 25 <br />CP13 1146$8 <br />Clothes dryer commercial, each$10-05 <br />- <br />CPI 3.11%-$10.35 <br />Rot Water systems, piping and equipment: <br />For steam or hot water heating piping and radiators convectors, hot water <br />panels, steam or hot water unit heaters, dothes pressing machines of any <br />type, and all connection to inq, Tial and rocessin ui merit: <br />_._. w. . P . _9 a9mk .�_ <br />Minimum deviceS8 25 <br />CPI 3.11%-$8.50 <br />_fee _first <br />n ue� Each additional device 10.45 <br />CP13.11 °6$10.80 <br />