My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2009-058
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2009
>
Reso 2009-058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:37:48 AM
Creation date
5/6/2009 4:09:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/4/2009
Retention
PERM
Document Relationships
3A Public Hearing 2009 0504
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0504
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE <br />FINANCE <br />TITLE B, Chapter 4 <br />FEES <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />Current Fee Reference <br />1 Hazardous Materials Storage <br />SLMC 3-3-300 <br />A. Annual fees for storage of combustible liquids, corrosives, flammable gases, <br />flammable liquids, flammable solids, nonflammable gases, organic peroxides, <br />other regulated materials, oxidizers, poisonous gasses, poisonous materials (1) <br />(2) Quantity Range 1 $101.00 <br />Quantity Range 2 $201.00 <br />Quantity Range 3 $291.00 <br />Quantity Range 4 $381.00 <br />Quantity Range 5 $476.00 <br />B. Annual Fees for Storage of Radioactive Materials (1) <br />$140.00 <br />C. Aboveground Tank Installation Permit (3) <br />First Tank <br />$291.00 <br />Each Additional <br />$101.00 <br />2 Accidental Release Program: Review of RMP by: <br />SLMC 3-3-300 <br />City Staff <br />$123.00/hr. <br />Outside consultant <br />Direct Costs plus 10% <br />Annual Fee <br />$123.00 <br />3 Underground Hazardous Materials Storage <br />SLMC 3-3-300 <br />A. Annual Operating Permit (4) : Each Tank <br />$106.00 <br />B. New Tank Installation (5) <br />First Tank <br />$806.00 <br />Each Additional <br />$196.00 <br />C. Tank Removal, Repair, Alterations (6) <br />First Tank <br />$392.00 <br />Each Additional <br />$196.00 <br />D. Minor Repairs and Alterations <br />$123.00/hr. <br />4 Contaminated Site Cleanup Program <br />A. Oversight of Remedial Investigations and Actions <br />City Staff <br />$123.001hr. <br />Outside Consultant <br />Direct Costs plus 10% <br />1 Includes permit processing and two Inspections annual one annual and one rs•Ins ctlon for compliance with the Uniform Fire Code, review of the HMSP, and review of all ernergency response plans <br />Quantity Range 1 Less than or equal to 500 pounds, 55 gallons, or 2,000 cubic feet at STP. <br />Quantity Range 2 Greater than 500 pounds, 55 aellone, or 2,O00 cubk feet at M but less than or equal to 5,O00 pounds, 550 gallons or 20 000 cubic feet at STP, respectively. <br />Quantity Range 3 Greater than 5,O00 pounds, 550 aellone, or 20 000 cubk feet at M but less than or equal to 50 000 pounds, 5,5W gallons or 200 000 cubic feet at STP respectively. <br />Quantity Range 4 Greater than 50 000 pounds, 5,5W aellone, or 200 000 cubic feet at STP but less than or equal to 500 000 pounds, 55 000 gallons, or 2 000 000 cubic feet at STP respectively. <br />Quantity Range 5 Greater than 500,000 pounds, 55,000 gallons, or $000,000 cubic feet at STP. <br />(3) lIncludes plan review, ffeld Inspecdons, and permitprocessing. Time for Inspections Is two hours for the ffrat tank and one hour each additional tank. <br />4 Includes rmk ceasln and taro Ins ecdons annual) onre annual and onre re -Ins ecdon for compliance with applicable federal and state uncle round tank and/or hazardous waste laws and regulations and/or the Unlform Flre <br />5 Includesplan review, ffeld Ins ecdons and pennit processing. Time for Inspections Is four hours for the ffrst tank and two hours each additional tank. Additional Inspections will be charged at the current hourly rate. <br />6 Includes plan reviews ffeld Inspections and pennit processing. Time for Inspections Is two hours for the first tank and two hours each additional tank. Additional Ins ecilons will be charged at the current hourly rate. <br />GAFEE812009-10 Fass\2000-10 Adopted Fees 33 5/15/2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.