My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2009 0615
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2009
>
Packet 2009 0615
>
8G Consent 2009 0615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2009 9:45:42 AM
Creation date
6/12/2009 9:45:40 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/15/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0615
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0615
Reso 2009-085
(Reference)
Path:
\City Clerk\City Council\Resolutions\2009
Reso 2009-086
(Reference)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Heron Bay -Engineer's Report FY 09-10 2 June 15, 2009 <br />Willdan Financial Services has been retained as the engineer of work, and has prepared the <br />Annual Engineer's Report for FY 2009-10. A copy of the Engineer's Report is attached to the <br />resolution accepting the Engineer's Report. <br />Analysis <br />Services to the District will be provided by: the City of San Leandro Public Works Department; <br />the County of Alameda Public Works Agency; outside consultants; and outside contractors. In <br />addition to maintenance of the facilities, the marshland will be monitored to confirm its health <br />and feral animals will be removed from the area. The total cost of these services for FY 2009-10 <br />is estimated at $327,397. <br />The portions of the levees that were damaged by the winter storms of 2005-06 were previously <br />repaired by the District at a cost of $170,000. The City is expecting a Federal Emergency <br />Management Agency (FEMA) grant to cover most of these costs allowing a refund of the <br />original $170,000 to the District. <br />In addition to the repair work described above, the levee system needs routine maintenance. <br />Staff has targeted 2014-15 as the year fora $200,000 maintenance project. The District will <br />contribute $100,000 to a CIP project for levee repair this year. Additional funds will be <br />contributed in subsequent years. <br />The District fund balance is estimated to be $450,489 at the end of FY 2008-09. In accordance <br />with the District rules, $300,000 of the funds must be held as a maintenance reserve for capital <br />improvements and unexpected or emergency repairs. <br />Fund Balance end of FY 2008-09 estimated $450,489.00 <br />Maintenance costs FY 2009-10 estimated ($327,397.00) <br />Funding for Levee maintenance project FY 2014-15 ($100,000.00) <br />FY 2009-10 Assessments $293,751.94 <br />Interest Income FY 2009-10 estimated $8,776.00 <br />Fund Balance at end of FY 2009-10 estimated $325,619.94 <br />The Annual Engineer's Report includes the following: <br />• Description of improvements maintained by funds provided by the District <br />• Budget based upon estimated costs for FY 2009-10 <br />• Table of maximum annual assessments, method of apportionment, and calculation of <br />proposed assessment <br />• Reference to location of Assessment Diagram for District <br />• Assessment Roll showing each property to be assessed and the amount of assessment <br />
The URL can be used to link to this page
Your browser does not support the video tag.