Laserfiche WebLink
B~'+est~ra Paoi~ic3 '[~ Tom= <br />15890 Foothill Blvd. • San Leandro, CA 94577 <br />Phone (510) 483-6400 ~ Fax (510) 483-1402 <br />The intersections shall be defined in groups on the system. Preset GIS views for optimal <br />display of signalized corridors will be established. <br />Task #20 - #21 CONFIGURATION OF SWITCHES AND ENCODERS <br />WPS will install, configure, and program the Cisco Catalyst fiber hub switch and <br />management settings connecting to the fiber optic field cables. Each fiber optic cable shall be <br />identified for performance confirmation testing during the edge switch deployment. The hub <br />switch shall be utilized as the foundation of the stand-alone ATMS network. <br />WPS will configure and program the EtherWAN edge switch management functions, and <br />Axis video encoder settings. These will be "bench tested" prior to field deployment. <br />The video encoder hardware will interface to the City's existing Pelco analog cameras via an <br />analog "T" splitter intercepting the original analog cable and feeding the signal to the video <br />encoder as well as the original analog fiber encoder. The proposed video encoder will <br />digitize the same analog video stream and send it back in MPEG4 format to the ATMS.now <br />server via the fiber optic cable backhaul. This will provide the City with a redundant method <br />of viewing video if one of the communications systems should fail. We do not recommend <br />have two sources of PTZ control and will not connect the RS-485 wires to the camera, but <br />the proposed video encoder will be capable of future PTZ control of the City's Pelco CCTV <br />cameras. <br />After each video encoder is installed, the digitized feed will be tested the local intersection <br />via the Ethernet based network. <br />The video encoder element will also be integrated into the video server workstation location <br />for CCTV camera selection and video recording functions. <br />Task #22: ATMS & CONTROLLER TRAINING (BEGINNING /INTERMEDIATE) <br />WPS will provide a full 2-day training session for the City staff for its initial training. This <br />training will include printed material, PowerPoint instruction, and hardware. The 2-day <br />training will include one day for ATMS.now Central Software Operation and one day for <br />Naztec controller operation. <br />Consulting Services Agreement between '] <br />City of San Leandro and Western Pacific Signal, LLC -Exhibit A <br />