My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2009 Western Pacific Signal LLC
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2009
>
Agmt 2009 Western Pacific Signal LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2009 5:03:59 PM
Creation date
7/9/2009 5:03:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/6/2009
Retention
PERM
Document Relationships
Reso 2009-101
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~+est®rn 1~a~ifYo B T~_ <br />15890 Foothill Blvd. • San Leandro, CA 94577 <br />Phone (510) 483-6400 ~ Fax (510) 483-1402 <br />Task #29: UPDATE AS-BUILT DOCUMENTATION <br />WPS will submit corrected and revised drawings, prints, user manuals, and other material <br />updates that reflect installed and as-build conditions of field deployed materials and TOC <br />installation items. <br />Task #3 D: FULL SYSTEM TEST <br />Upon successful completion of the final cabinet installations described in Task #28, WPS <br />will initiate a full ATMS.now system test of all installed elements. This test will confirm all <br />system data is sent and received to the field without disruption to service and all of the <br />elements are fully functional. At this point the ATMS software will begin collecting full <br />system data for future report generation. <br />This test will be performed at both the ATMS server and workstation locations within City <br />Hall and the Corp Yard. <br />Task#31: ADDRESS P UNCH LIST ITEMS <br />At this time WPS will make final corrections and adjustments to any concern that the City <br />has with the performance of the product. WPS will address remediation items identified as <br />needing correction within the full system task #301isted above. <br />Task #32 ATMS & CONTROLLER TRAINING (ADVANCED) <br />WPS will provide further on-site training sessions for the City staff for controller database <br />and ATMS software training. This training will include printed material, PowerPoint <br />instruction, and hardware. The topics and training agenda will continue and build upon the <br />free timing and coordination strategies covered within task #22, task #24, and task #25, <br />utilizing both test controllers and a larger pool evaluation of live, field installed intersections. <br />This task item will focus a greater amount of time on utilization of the CCTV features and <br />functions, including preset alarm triggering and recording functions. <br />Task#33: SYSTEMACCEPTANCE TEST and PROJECT CONCL~ISIONINTERVIEW <br />WPS will meet with the City to perform functional system acceptance test of each hardware <br />elements of the ATMS system, communication switches, video cameras, and controller <br />operation. At this time WPS will show that all punch-list items have been addressed and <br />Consulting Services Agreement between 9 <br />City of San Leandro and Western Pacific Signal, LLC -Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.