Laserfiche WebLink
BID SUMMARY <br />-, , <br />e o - ~~,~, <br />- AND <br />~nrr,~ rsov <br />~..,...-.f......'_ <br />PROJECT TITLE: Washington Ave/Estabrook St. Intersection Improvements <br />PROJECT NO.: 09-150-38-283 <br />BID NO.: 08-09.023 <br />his document is a summary of bids received for the subject project and are provide <br />only as a convenience. Listing of a particular bid is not a finding that such bid ha <br />been found to be responsive or accepted as complete by the City. An award o <br />contract, if any, is subject to approval of the City Council and/or the City Manager. <br />Contractors should refer to the contract documents for bidding information. <br />BID OPENING <br />DATE: Tuesday, June 23, 2009 <br />TIME: 3:00 PM <br />LOCATION: City Clerk ENGINEER'S ESTIMATE <br />Date Approved: 5/22/2009 <br />Prepared by: NL RAH Electrical Contractor, Inc. <br />8909 Florin Road <br />Sacramento, CA 95829 <br />Phone: 916-386-8857 <br />Fax:916-386-1354 O.C. Jones & Sons, Inc. <br />1520 Fourth Street <br />Berkeley, CA 94710 <br />Phone: 510-526-3424 <br />Fax: 510-526-0990 Redgwick Construction Co. <br />8150 Enterprise drive <br />Newark, CA 94560 <br />Phone: 510-792-1727 <br />Fax: 510-792-1728 <br />ITEM <br />NO. QUANTITY ITEM UNIT COST ITEM COST UNiT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br />1 1 LS Mobilization $15,000.00 $15,000.00 $3,500.00 $3,500.00 $17,000.00 $17,000.00 $4,000.00 $4,000.00 <br />2 1 LS Temporary Traffic Control $20,000.00 $20,000.00 $2,200.00 $2,200.00 $13,000.00 $13,000.00 $6,000.00 $6,000.00 <br />3 1 LS Water Pollution Control $10,000.00 $10,000.00 $500.00 $500.00 $2,000.00 $2,000.00 $150.00 $150.00 <br />4 1 LS Clearing and Grubbing $10,000.00 $10,000.00 $6,000.00 $6,000.00 $3,000.00 $3,000.00 $1,000.00 $1,000.00 <br />5 1,500 LF Furnish and Install 24 Strands $4.00 $6,000.00 $3.00 $4,500.00 $6.50 $9,750.00 $4.00 $6,000.00 <br /> Fiber <br />6 3,000 LF Install and Trace Wire and Rope $1.50 $4,500.00 $0.75 $2,250.00 $1.00 $3,000.00 $1.00 $3,000.00 <br /> in Empty Conduit <br />7 1,500 LF Install (2) 2" Conduits (Bore or $30.00 $45,000.00 $15.00 $22,500.00 $15.00 $22,500.00 $17.00 $25,500.00 <br /> Trench Method) <br />8 6 EA Install N48 Pull Box $1,000.00 $6,000.00 $800.00 $4,800.00 $1,500.00 $9,000.00 $900.00 $5,400.00 <br />9 2 EA Install and Terminate Fiber at $4,500.00 $9,000.00 $4,406.00 $8,812.00 $3,000.00 $6,000.00 $5,000.00 $10,000.00 <br /> Traffic Control Cabinet, Provide <br /> tranceiver, Fiber Patch Cord, <br /> Connectors 8~ Splice Enclosure, <br /> System Testing <br />10 1 EA Furnish Additional Transceiver $2,500.00 $2,500.00 $2,080.00 $2,080.00 $2,100.00 $2,100.00 $1,800.00 $1,800.00 <br /> (as spare unit) <br />Bid Summary -Washington-Estabrook Intersection Improvements.xlsx Page 1 of 8 Printed 6/24/2009 ~ 1:53 PM <br />