My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2009 0720
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2009
>
Packet 2009 0720
>
8I Consent 2009 0720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2009 10:14:28 AM
Creation date
7/17/2009 10:14:27 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/20/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0720
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0720
Reso 2009-114
(Reference)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />STAFF REPORT <br />DATE: July 20, 2009 <br />TO: Stephen L. Hollister, City <br />APPROVED AND <br />FORWARDED <br />TO CITY COUNCIL <br />~ ~~-'' <br />Step en L. Hollister <br />City Manager <br />FROM: Uchenna Udemezue, Directot~ ~` <br />Engineering and Transportatio Department <br />BY: Keith Cooke, Principal Engine r <br />Engineering and Transportation Depa ment <br />SUBJECT PROJECT/PROJECT DESCRIPTION: <br />RESOLUTION OF AWARD OF CONTRACT TO FBD VANGUARD CONSTRUCTION FOR <br />THE WICKS BOULEVARD SIDEWALK PROJECT, PROJECT NO. 09-144-36-287. <br />SUMMARY AND RECOMMENDATION <br />This project will construct a sidewalk and wheelchair ramps on the east side of Wicks Boulevard <br />between Stenzel Park and Burkhart Avenue. <br />Staff recommends award of contract to FBD Vanguard Construction in the amount of <br />$110,322.00 for the subject project. <br />BACKGROUND <br />On the easterly side of Wicks Boulevard between Stenzel Park and Burkhart Avenue, the gravel <br />path has become overgrown with ivy. This path is often used as a pedestrian walkway when <br />large events are held at the Marina Community Center or Stenzel Park. Wicks Boulevard at the <br />Marina Community Center is a key spot in our Pedestrian Project list in the Pedestrian and Bike <br />Master Plan as well as the Sidewalk Gap Program. <br />Analysis <br />The approved plans call for approximately 1,100 feet of sidewalk to be installed between Stenzel <br />Park and Burkhart Avenue along Wicks Boulevard. About 177 feet of retaining wall will also be <br />installed at heights varying from 1 foot to 1.75 feet tall. The width of the sidewalk will be <br />American with Disabilities Act (ADA) compliant and varies from 4.5 feet to 5 feet, depending <br />on whether a retaining wall is present in that location. A total of four new ADA ramps will also <br />be installed within the project limits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.