<br />PROJECT TITLE: Wicks Boulevard Sidewalk
<br />PROJECT NO.: 08-144-36-287
<br />Qln AIl1 na nn A9A
<br />is document is a summary of bids received for the subject project ana arE
<br />wided only as a convenience. Listing of a particular bid is not a finding that suct
<br />i has been found to be responsive or accepted as complete by the City. An awarc
<br />contract, if any, is subject to approval of the City Council and/or the City Manager
<br />retractors should refer to the contract documents for bidding information.
<br />~.rw ~w.. vutio.vr.+
<br />BID OPENING
<br />DATE: Wednesday, June 30, 2009
<br />TIME: 3:00 PM
<br />LOCATION: City Clerk
<br />ENGINEER'S ESTIMATE
<br />Date Approved: 5/22/2009
<br />Prepared by: NN
<br />FBD Vanguard Construction
<br />651 Enterprise Court
<br />Livermore, CA 94550
<br />Phone: 925-245-1300
<br />Fax:925-245-1007
<br />Ameca General Engineering
<br />2472 E. Atlantic Avenue
<br />Fairfield, CA 94533
<br />Phone: 707-689-3893
<br />Fax:707-419-4171
<br />AME Contracting Company
<br />1694 Tammy Lane
<br />Concord, CA 94519
<br />Phone: 925-429-0090
<br />Fax: 925-429-1000
<br />ITEM
<br />NO.
<br />QUANTITY
<br />ITEM
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />1 1 LS Mobilization $6,502.05 $6,502.05 $7,000.00 $7,000.00 $4,800.00 $4,800.00 $5,500.00 $5,500.00
<br />2 1 LS Traffic Control 8 Construction $2,000.00 $2,000.00 $4,800.00 $4,800.00 $2,800.00 $2,800.00 $3,000.00 $3,000.00
<br /> Area Signs, Lane Closures &
<br /> Detours
<br />3 1 LS Clear and Grub $3,000.00 $3,000.00 $18,500.00 $18,500.00 $20,236.00 $20,236.00 $10,000.00 $10,000.00
<br />4 120 LF Install curb and gutter per $48.00 $5,760.00 $32.00 $3,840.00 $28.00 $3,360.00 $41.00 $4,920.00
<br /> drawing 100 case 3101
<br />5 4,425 SF Install sidewalk per drawing 100 $13.50 $59,737.50 $6.30 $27,877.50 $5.00 $22,125.00 $8.50 $37,612.50
<br /> case 3101
<br />6 470 SF Install wheelchair curb cut ramp $18.00 $8,460.00 $11.00 $5,170.00 $15.00 $7,050.00 $22.00 $10,340.00
<br /> per drawing 106A and and B
<br /> case 3101
<br />7 3 EA Adjust Pull Box to finished grade $500.00 $1,500.00 $120.00 $360.00 $225.00 $675.00 $500.00 $1,500.00
<br />8 1 LS Sriping per drawing 616 case $1,000.00 $1,000.00 $935.00 $935.00 $1,900.00 $1,900.00 $800.00 $800.00
<br /> 3101 and project plans
<br />9 350 LF 6" Retaining Curb per detail C/7 $18.50 $6,475.00 $14.00 $4,900.00 $20.00 $7,000.00 $47.00 $16,450.00
<br />10 57 LF Excavate, Construct, Backfill 6" $175.00 $9,975.00 $42.00 $2,394.00 $41.00 $2,337.00 $65.00 $3,705.00
<br /> Retaining Wall (Height=1.75`)
<br /> per A17
<br />11 43 LF Excavate, Construct, Backfill 6" $120.00 $5,160.00 $36.00 $1,548.00 $37.00 $1,591.00 $63.00 $2,709.00
<br /> Retaining Wall (Height=1.25')
<br /> per A/7