Laserfiche WebLink
-~. BID SUMMARY <br />,,. <br />•'~~N M~~ <br />PROJECT TITLE: Wicks Boulevard Sidewalk <br />PROJECT NO.: 08-144-36-287 <br /> <br />BID NO.: 08-09.024 <br />ti <br />CF Contracting <br />BID OPENING ENGINEER'S ESTIMATE Sposeto Engineering, Inc. on <br />AJW Construc <br />DATE: Wednesday, June 30, 2009 Date Approved: 5/22/2009 4301 Bettencourt Way 966 81st Avenue 96 Forrest Avenue <br />CA 94980 <br />Fairfax <br />TIME: 3:00 PM Prepared by: NN Union City, CA 94587 Oakland, CA 94621 <br />Phone: 510-568-2300 , <br />Phone: 415-310-5442 <br />LOCATION: City Clerk Phone: 510-487-2424 <br />Fax:510-487-6210 Fax: 510-639-1578 Fax:415-723-7348 <br /> <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />00 <br />$100 <br />ITEM COST <br />700 <br />00 <br />$7 <br />UNIT COST <br />$45.00 <br />ITEM COST <br />$3,465.00 <br />12 77 LF Excavate, Construct, Backfill 6" $93.00 $7,161.00 $121.00 $9,317.00 . . <br />, <br /> Retaining Wall (Height=1.00') <br /> <br />13 <br />2 EA per A/7 <br />Salvage existing street light and <br />$5,000.00 <br />$10,000.00 <br />$2,&00.00 <br />$5,200.00 <br />$2,750.00 <br />$5,500.00 <br />$2,~0•~ <br />$4.000.00 <br /> reinstall per dwg 500A case <br /> 3101 including box <br />n per <br />il Park Si <br />St <br />l <br />t <br />000.00 <br />$3 <br />$3,000.00 <br />$600.00 <br />$600.00 <br />$800.00 <br />$800.00 <br />$3,500.00 <br />$3,500.00 <br />14 1 EA g <br />enz <br />oca <br />e <br />Re , <br /> <br />15 <br />1 LS project plans <br />Install new Sign Pole and Sign <br />$1,000.00 <br />$1,000.00 <br />$330.00 <br />$330.00 <br />$400.00 <br />$400.00 <br />$2,000.00 <br />$2,000.00 <br /> <br />16 <br />400 SF per dwg 136 case 3101 <br />Install Valley Gutter per drawing <br />$30.00 <br />$12,000.00 <br />$12.40 <br />$4,960.00 <br />$20.00 <br />$8,000.00 <br />$15.00 <br />$6,000.00 <br /> <br />17 <br />1,125 SF 114 case 3101 <br />Install 2" Conduit with 3 #8 wires <br />$35.00 <br />$39,375.00 <br />$19.00 <br />$21,375.00 <br />$20.00 <br />$22,500.00 <br />$10.00 <br />$11,250.00 <br /> and 1 #6 wire connected <br /> <br />18 <br />3 EA complete <br />Install New 6E Pull Box <br />$600.00 <br />$1,800.00 <br />$650.00 <br />$1,950.00 <br />$660.00 <br />$1,980.00 <br />$500.00 <br />$1,500.00 <br />TOTAL BASF BID: $183,905.55 $136,482.50 $141,852.50 $144,946.00 <br />SUBCONTRACTORS- <br />• Chrisp Comp., Columbia Electric Columbia Electric, Striping Buikico Engineering 8 <br /> Graphics Construaion <br />SECURITIES: 10% Bid Bond 10% Bid Bond 10% Bid Bond <br />NOTES: <br /> <br /> Printed 7/1/2009 ®10:37 AM <br />Bid Summary -Wicks Boulevard Sidewalk.xlsx <br />Page 5 of 9 <br />