Laserfiche WebLink
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br />TABLE OF CONTENTS <br />ABBREVIATIONS ACRONYMS <br />EXECUTIVE SUMMARY <br />4 <br />INTRODUCTION 9 <br />Section 1. GOALS 9 <br />$ectlOn 2. ORGANIZATIONAL STRUCTURE 10 <br />Section 3. LEGAL AUTHORITY 12 <br />Section 4. OPERATION AND MAINTENANCE PROGRAM 13 <br />Section 5. DESIGN AND PERFORMANCE PROVISIONS _ _ 20 <br />Section 6. OVERFLOW EMERGENCY RESPONSE PLAN <br />Section 7. FATS, OILS AND GREASE (FOG) CONTROL PROGRAM` <br />Section 8. SYSTEM EVALUATION ANb CAPACITY ASSURANCE PLAN <br />21 <br />22 <br />25 <br />Section 9. MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS 2$ <br />Section 10. SSMP PROGRAM AUDITS 30 <br />Section 11. COMMUNICATION PROGRAM 31 <br />NOTE: APPENDICES ARE LOCATED IN VOLUME II OF THIS PLAN. <br />Pad ~2 <br />