Laserfiche WebLink
Concept Marine Associates, Inc. <br />FEE SCHEDULE <br />(Effective April 1, 2004) <br />Professional and Technical Personnel Classifications <br />Principal Project Manager $175.00 <br />Principal Engineer $160.00 <br />Senior Project Manager $149.00 <br />Area Construction Manager $134.00 <br />Senior Construction Manager $129.00 <br />Project Manager /Senior Engineer $118.00 <br />Construction Manager /Resident Engineer $99.00 <br />Project Engineer $93.00 <br />Cost Estimator $93.00 <br />Senior Planner /Permit Specialist $93.00 <br />Senior CARD Drafter $90.00 <br />Staff Engineer $84.00 <br />Webmaster $82.00 <br />CARD Operator /Drafter $79.00 <br />Asst. CM /Field Engineer $57.00 - $77.00 <br />Inspector $64.00 - $108.00 <br />Clerical /Document Control $40 - $60.00 <br />Other Services <br />Consultants, Special Equipment, <br />Reproduction, Materials, and <br />Other Outside Charges: COST + 10% <br />Vehicle Transportation: $0.375 per mile <br />Relocate Boat Launch Ramp January 6, 2005 <br />Project. No. 150-38-246 Page 20 of 21 <br />