Laserfiche WebLink
~.tl ENVIItONMENTAL CHECIQ.IST <br />ENVIRONMENTAL IMPACTS <br />Less Than <br />Significant <br />Potentially With Less Than <br />Signiftcant Mitigation Significant No <br />Issues (and Supporting Information Sources): Impact Incorporation Impact Impact <br />I. AESTHETICS -- Would the Project: <br />a) Have a substantial adverse effect on a scenic vista? ^ ^ ® ^ <br />b) Substantially damage scenic resources, including, <br /> but not limited to, trees, rock outcroppings, and <br /> historic buildings within a state scenic highway? ^ ^ ® ^ <br />c) Substantially degrade the existing visual character <br /> or quality of the site and its surroundings? ^ ^ ® ^ <br />d) Create a new source of substantial light or glare <br /> which would adversely affect day or nighttime <br /> views in the area? ^ ^ ® ^ <br />SETTING OVERVIEW <br />The Project proposes the construction of additional pipeline to the existing EDBA pipeline to distribute <br />recycled water for irrigation. All proposed pipeline segments would be installed underground or hung <br />from an existing or proposed bridge. There would be some temporary visual changes, but less than <br />significant changes to the visual condition of the Project area in Oyster Bay Regional Park and Marina <br />Park. There would be a permanent 20 foot by 20 foot water recycling disinfection and filtration plant <br />(water recycling plant) built at the Monarch Bay Golf Complex and a disinfection and filtration facility at <br />the WPCP. Scenic resources would not be damaged by construction, and any damaged roads or <br />landscaping as a result of construction would be repaired or replaced. There are no historic buildings in <br />the vicinity of the Project azea. However, up to six ornamentals trees would be removed at the Monarch <br />Bay Golf Complex for construction of the water recycling plant. <br />DISCUSSION <br />a,b) Proposed pipelines would be buried underground causing no permanent changes in the visual <br />condition of the Project area. The water recycling plant at the Monarch Bay Golf Complex would <br />have above-ground structures occupying a 400 squaze foot site within the golf course along the <br />fence line bordering Monarch Bay Drive. The building would be similar in appearance to <br />existing structures at the golf course and therefore would not alter the visual character of the area. <br />Construction of this facility would require the removal of up to six trees along the western fence <br />line. Given the number of trees to be removed and the relatively small size of the affected area, <br />this is not considered a significant impact. <br />The disinfection and filtration facility at the WPCP would be surrounded by similar structures. It <br />would be unlikely to be visible from any off-site locations. <br />San Leandro Recycled Waty Project 2.-5 ESA /203193 <br />Drafr IS/MND <br />