Laserfiche WebLink
3.0 MITIGATION SUMMARY AND MuNITORING REPORTING PLAN <br />3.15 TRANSPORTATION /TRAFFIC <br />Measure T-1: Prepare and comply with a Traffic Control Plan. <br />The City shall prepare and implement a Traffic Control Plan, in accordance with professional <br />engineering standards prior to construction, for all Project-affected roadways and intersections. <br />The Traffic Control Plan shall comply with requirements in encroachment permits. The Traffic <br />Control Plan shall include, but not be limited to, the following measures: <br />^ Identify all roadway locations where special construction techniques (e.g., directional <br />drilling or night construction) would be used to minimize impacts to traffic flow. <br />^ Develop circulation and detour plans to minimize impacts to local street circulation. This <br />may include the use of signing and flagging to guide vehicles through and/or around the <br />construction zone. <br />^ Schedule truck trips outside of peak morning and evening commute hours. <br />^ Limit lane closures during peak hours to the extent possible. <br />^ Use haul routes minimizing truck traff c on local roadways to the extent possible. <br />^ Include detours for bicycles and pedestrians in all areas potentially affected by Project <br />construction. <br />^ Install traffic control devices as specified in the California Department of Transportation <br />Manual of Traffic Controls for Construction and Maintenance Work Zones. <br />^ Develop and implement access plans for highly sensitive land uses such as police and fire <br />stations, transit stations, hospitals, and schools. The access plans would be developed with <br />the facility owner or administrator. To minimize disruption of emergency vehicle access, <br />ask affected jurisdictions to identify detours, which will then be posted by the contractor. <br />Notify in advance the facility owner or operator of the timing, location, and duration of <br />construction activities and the locations of detours and lane closures. <br />^ Store construction materials only in designated areas. <br />^ Coordinate with local transit agencies for temporary relocation of routes or bus stops in <br />works zones, as necessary. <br />IMPLEMENTATION <br />PROCEDURE MONITORING AND <br />REPORTING ACTIONS MONITORING <br />RESPONSIBILITY MONITORING <br />SCHEDULE <br />I . City shall include traffic 1. City reviews traffic I. City 1. Prior to <br />requirements in construction requirements. construction <br />specifications. <br />2. Contractor implements 2. Sign-off by City that 2. City 2. During <br />construction requirements. measures are being construction <br /> im lemented. <br />San Leandro Recycled Water Project 3 -12 ESA / 203213 <br />IS/MND <br />