My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2005 New World Systems
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2005
>
Agmt 2005 New World Systems
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 10:08:14 AM
Creation date
7/30/2009 8:51:02 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/7/2005
Retention
PERM
Document Relationships
Reso 2005-022
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Lcandro, California <br />Statement of Work <br />New World Project Manager will work with San Leandro Project Manager to address all issues during <br />Acceptance Testing Procedure. <br />Review San Leandro Acceptance Tcsling Procedure. <br />New World Deliverables <br />New World Systems will provide the following deliverables: <br />• New World Project Management, using hours fi~om Exhibit B, will participate, assist, tell, and evaluate the <br />Licensed Software to meet Acceptance as defined in Exhibit I. <br />• New World will track and report all reported issues to resolution. <br />• Provide Warranty Support. <br />Customer Responsibilities <br />Customer will be responsible for: <br />• Develop an Acceptance Testing Plan that will match requirements as outlined in Exhibit I. <br />• Documenting and reporting all issues that appear not to meet Acceptance Testing. <br />• Load data, conduct data review, evaluate test results. <br />Customer Deliverables <br />Customer will provide the following deliverables: <br />• Provide New World with an Acceptance Testing sign-off document (e.g. letter from the Customer Project <br />Manager). <br />3.9 Field Reporting Tailoring and Setup <br />Obj ecYive: <br />To complete the Field Reporting set-up (software, hardware and form building) in preparation for user training. <br />New World Responsibilities <br />New World Systems will be responsible for: <br />• Establish Server connectivity to network. <br />• Install Field Reporting Server. <br />• Establish Message Switch/Network/Server connectivity for Upload. <br />• Install Eield Reporting software on Server. <br />• Initiate the Client upload of DB tables. <br />• Install Field Reporting software on a Client (in Station), train Customer to install remaining clients. <br />• Instruct Customer on screen designs. <br />• Instruct Customer on mandatory input fields. <br />• Review Customer build screens and assist with alterations. <br />• Complete software install of server and client <br />New World Deliverables <br />• Provide training. <br />Customer Responsibilities <br />Customer will be responsible lbr: <br />• Provide appropriate staff to work with Ncw World during the initial set up. <br />• Attend training on how to build Customer specific Field Rcporting screens. <br />• Each student will be required to have their own tcnninal during training. <br />• Build additional Build Screens. <br />• Provide Training facility and required equipment. <br />• Set-up Training enviromncnt (FR terminals for students). <br />• Complete installation of Field Rcporting software on clients. <br />
The URL can be used to link to this page
Your browser does not support the video tag.