Laserfiche WebLink
10.9 Contract Administration. This Agreement shall be administered by Nick Thom <br />who shall act as the City's representative. All correspondence shall be directed to <br />or through Nick Thom or his or her designee. <br />10.10 Notices. Any written notice to Consultant shall be sent to: <br />Dawn Merkes <br />Group 4 Architecture, Inc <br />211 Linden Ave <br />South San Francisco, CA 94080 <br />650-871-0709 <br />Any written notice to City shall be sent to: <br />Nick Thom <br />City of San Leandro <br />Engineering and Transportation Department <br />835 East 14`" Street <br />San Leandro, CA 94577 <br />10,11 Professional Seal. Where applicable in the determination of the City, the first <br />page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed <br />professional responsible for the report/design preparation. <br />10.12 Integration; Incorporation. This Agreement, including all the exhibits attached <br />hereto, represents the entire and integrated agreement between City and <br />Consultant and supersedes all prior negotiations, representations, or agreements, <br />either written or oral. All exhibits attached hereto are incorporated by reference <br />herein. <br />10.13 Counterparts. This Agreement maybe executed in multiple counterparts, each <br />of which shall be an original and all of which together shall constitute one <br />agreement. <br />Washington Manor Library February 9, 2005 <br />Project No. 210-69-146 Page 13 of 21 <br />