Laserfiche WebLink
<br />CDS Storm Water Treatment Unit <br />Date <br />INSPECTION CHECKLIST <br />1. During the rainfall season, inspect and check condition of unit at least once <br />every 30 days. <br />2. Ascertain that the unit is functioning properly (no blockages or obstructions <br />to inlet andlor separation screen). <br />3. Measure amount of solid materials that have accumulated in the sump (unit <br />should be cleaned when the sump is 75-85% full}. <br />4. Measure amount of fine sediment accumulated behind the screen. <br />5. Measure amount of floating trash and debris in the separation chamber. <br />MAINTENANCE CHECKLIST <br />1. Clean out unit at the end and beginning of the rainfall season. <br />2. Pump down unit (at least once a year) and thoroughly inspect separation <br />chamber, separation screen and oil baffle. <br />3. No visible signs of damage or loosening of bolts to internal components <br />observed. <br />* If there is any damage to the internal components or <br />fasteners are damaged or missing please contact CDS <br />Technologies. <br />Exhibit D <br />