My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2005-059
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2005
>
Reso 2005-059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 1:45:38 PM
Creation date
8/3/2009 1:45:35 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/16/2005
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO ADMIlVISTRATIVE CODE <br />TITLE 6 FINANCE <br />Chapter 4 Fees <br />2005-06 <br />Adopted <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative <br />Code (SLAG) or the general laws of the State of California. <br />Descri tion C4nrent Fee Reference <br />COMMUIVIT'Y DEVELOPMENT DEPARTMENT -Building Regulations Division <br />3. Electrical Pernut (continued) <br />Circuits: Installation, replacement or alteration of each electrical circuit (includes related outlets, switches, receptacle _ <br />and lighting fxturses): <br />15 to 20 ampere circuit $8.75 <br />21 to 30 ampere circuit $9.50 <br />31 to 40 ampere circuit $9.75 <br />41 to 50 ampere circuit $10.50 <br />51 to 70 ampere circuit $11.25 <br />71 to 100 ampere circuit $14.25. _ _ <br />.101 to 200 ampere circuit $20.75 <br />Over 200 ampere capacity $21.00 PLUS $6.25 for each additional 100 ampere capacity <br /> or fraction thereof <br />Trolly and plug-in type bus-ways, per linear foot $0.50 <br />Lighting fixtures, brackets, pendants, cord drops, $1.00. <br />outlets, receptacles, switches and other lamp holding <br />devices, each on existing circuits <br />Multi-outlet assemblies, light tracts, per linear foot $0.75 <br />Temporary power service pole or pedestal, each.. $25.50 <br />Temporary distribution system (for construction sites, $25.50... <br />Xmas tree lots, etc.), each <br />_ _ <br /> <br />_ _ <br />__ <br />__ <br />_. <br />06/09/05 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.