My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2005-139
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2005
>
Reso 2005-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2009 12:12:20 PM
Creation date
8/6/2009 12:12:19 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
9/19/2005
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Add the Central Alameda County Freeway System Operational Analysis as follows: <br />Project/Study: Central Alameda County Freeway System Operational Analysis <br />Cost: $5 million ACTA Measure B Sales tax contribution: $S million <br />Sponsor: Alameda County Transportation Improvement Authority (ACTIA) and <br />Alameda County Congestion Management Agency (ACCMA) <br />Description: <br />.~ SAM t ~ . x <br />~ ~ ~ A're~,~set <br />_UII~M o ~d' ~{~BR1 ~'~ <br />t ~b <br />~`` ~\4 l u{lp ~f{ C~M~~n % <br />v,,' _ '~\ 1~ `` ~~~ 'VJP~•" 'fir ~~.~.,....1'f~; <br />~ ~ ~ ~ 4,~ tYI1WUI `"_ ~ ~'~ <br />'~-~..~ <br />~a <br />c., '€ '} <br />~'""'L`~ 'I ~ PS'MiJelC} ti. <br />;~ ' <br />5 'd'~^`^"'"` /ktCirgl <br />'k' N , - ~ <br />i ~ <br />l'~ <br />;~ ,; ~ ~~ <br />,~,~ <br />r ~ i CEMlCAi COIIMV FREEWAY S1f57EM CYPERATfUNAi ANAiY5i5 <br />t ~.~, 9 ~.~iMNIM'SRT ros+tacanrF +w%w~w+n~»rd+n~e+wvr~- <br />The transportation planning study will document the long and short range <br />plan for State highway improvements in the I-880, I-580 and I-238 <br />Corridors, in Central Alameda County. The study shall include planning <br />level traff c operations analysis, traffic congestion and operational <br />problem/deficiency identification, benefit-cost analysis, project <br />implementation strategy, and technical report. The Central County area <br />includes the Cities of Hayward, San Leandro and unincorporated areas of <br />Alameda County. The suggested limits for the corridors to be studied are: <br />I-880 from Whipple Road to Davis Street; I-580 from Crow Canyon to 1- <br />238; and I-238 from I-580 to I-880. Specific projects to be considered in <br />this planning study will include, but will not be limited to those in the <br />Alameda Countywide Transportation Plan and the ACTIA Measure B <br />Expenditure Plan, as well as those that already have approved Project Study <br />Reports. Other roadway improvements may be added as appropriate. <br />The purpose and objective of the study involves the development of a <br />technical report that addresses the long-range plan and the sequencing of <br />improvements that will be required to achieve the most practical traffic <br />relief in the I-880, I-580 and I-238 Corridors. The technical report will <br />summarize the various project scopes, schedules and costs; funding <br />availability; recommended project sequencing; and an implementation <br />strategy that will provide the improvements that are most cost effective and <br />consistent with the transportation needs in the area. The technical report <br />could be also used for preparation of programming documents (Caltrans <br />Rev: July 13. 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.