My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2005 Hudson ICS
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2005
>
Agmt 2005 Hudson ICS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2009 5:54:52 PM
Creation date
8/6/2009 1:13:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/7/2005
Retention
PERM
Document Relationships
Reso 2005-147
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Work; Satisfaction of City Engineer. All of the work on the required improvements is to be <br />done at the places, with the materials, in the manner, and at the grades, all as shown upon the approved <br />plans and specifications, and to the reasonable satisfaction of the City Engineer. <br />3. Work; Inspections; Fees. The City Engineer or his designee shall inspect all of the <br />improvements made pursuant hereto to determine that they comply with all City regulations. Concurrently <br />with the execution of this agreement, the Owner shall deposit with the City the sum of FIVE THOUSAND <br />DOLLARS ($5,000) to cover the cost of inspection of the improvements. Owner hereby agrees to increase <br />the amount of the deposit to pay City the actual cost of inspection if such costs should exceed the original <br />deposit. <br />4. Modification for Unforeseeable Circumstances. Owner reserves the right to modify said <br />plans and specifications as the development progresses should unforeseen conditions occur, providing <br />written approval is first obtained from the Cit~En ~neer. The City shall bear no responsibility whatsoever <br />for work performed and rejected by the City Engineer. City reserves the right to make reasonable <br />modifications to the plans and specifications whenever field conditions and/or public safety require such <br />modifications. Owner shall pay City for all costs incurred in plan checking and inspection resulting from <br />said modifications. <br />5. Work; Time for Commencement and Performance. Ciry hereby fixes the time for the <br />commencement of the required work to be on or before the 19"' day of September, 2005, and for its <br />completion to be on the 18r~ day of September, 2006. At least 15 calendar days prior to the <br />commencement of work hereunder, Owner shall notify the City Engineer in writing of the date fixed by <br />Owner for commencement thereof, in order that the City Engineer shall be able to provide services for <br />inspection. <br />Concurrently with the execution of this agreement, Owner shall deposit with City the sum of <br />$52,859 to defray costs to be paid by City to Union Pacific under the Railroad Crossing Agreement <br />(consisting of $29,800 for crossing rights and estimated cost of $23,059 for signal arm relocation). Upon <br />STANDARD PUBLIC YMPROVEMENT AGREEMENT Page 3 of 16 <br />G:A_LD\ Address\400 Hudson Ln -Hudson ProperfyU 155057_3.DOC <br />1155057.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.