My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2005 Maybelle Properties LLC
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2005
>
Agmt 2005 Maybelle Properties LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2009 5:56:58 PM
Creation date
8/6/2009 1:27:22 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/7/2005
Retention
PERM
Document Relationships
Inst 2005517543
(Reference)
Path:
\City Clerk\City Council\Recorded Documents\2005
Reso 2005-149
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) Subdivider agrees to take all steps necessary to mitigate the potential generation of air-borne <br />dust or debris during the performance of the work hereunder. Subdivider further agrees that the City <br />Engineer, as the sole and final judge, may order all or any portion of the work to be suspended in the event <br />air-borne dust or debris leaves the work area and causes a nuisance to adjoining property owners or the <br />public at large. Such suspensions shall remain in effect until the City Engineer is fully satisfied that the <br />work practices causing the air-borne dust or have been satisfactorily mitigated and the adversely affected <br />properties or areas have been thoroughly cleaned. <br />(f) Construction activity for public improvements shall not commence prior to 8:00 a.m. and <br />shall cease by 5:00 p.m., Monday through Friday, and no work on Saturdays and Sundays, unless otherwise <br />approved by the City Engineer. Prior to working on Saturday and Sunday, the Subdivider's Contractor shall <br />inform the Engineering Inspector 48 hours advance to schedule an inspection. There shall be no <br />construction activity on Sundays and legal holidays. Interior construction such as sheet rock taping and <br />texturing, painting, the installation and similar activity shall be permitted outside the above working hours <br />provided that construction noise shall not be detectable outside of the new homes being built. <br />(g) Truck hauling activities shall be restricted to 8 a.m. - 3:30 p.m. There shall be no truck <br />hauling activity on Saturdays, Sundays and legal holidays. <br />(h) The contractor shall be required to employ the quietest among alternative equipment or to <br />muffle/control noise from available equipment. <br />(i) Insofar as possible, noisy operations shall be performed off-site or on portions of the site <br />distant from residential neighborhoods. <br />(j) All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day, 2) trucks hauling construction <br />materials shall be covered with tarpaulins or other effective covers, 3) streets surrounding demolition and <br />construction sites shall be swept at least once per day, and 4) paving and planting shall be done as soon as <br />possible. City shall charge applicant, and applicant shall pay, for all costs of sweeping city streets in the <br />vicinity of the project as necessary to control dust and spillage. <br />(k) All construction contracts shall include requirements that construction equipment avoid <br />unnecessary idling to reduce CO, ROG and NOX emissions. <br />TRACT MAP 7560 <br />SUBDIVISION IMPROVEMENT AGREEMENT <br />G:A LD\ Tract Map & Parcel Map\TM7560-82 Chumalia St~SUBIMP.AGR.doc PAGE 14 OF 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.