Laserfiche WebLink
,' <br />PROFESSIONAL SEAL. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal <br />and Signature of Registered Professional with report/design responsibility" as per sample below. <br />Amended Contractual Services Agreement l BMS <br />Monarch Bay Drive/Fairway Drive to Marina Boulevard <br />Page 19 of 19 <br />Project No. 120-38-243 <br />