My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2004 BMS Design Group
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2004
>
Agmt 2004 BMS Design Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2009 11:16:30 AM
Creation date
8/7/2009 11:15:25 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/2/2004
Retention
PERM
Document Relationships
Reso 2004-018
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />Introduction: <br />This contract is for the design development of Monarch Bay Drive and the Bay Trail from Marina <br />Boulevard to Fairway Drive. Scope of services will be based upon the concept design summarized <br />in the San Leandro Marina Connections Plan, dated April 2003 and the Concept Plan prepared by <br />John Cahalan Landscape Architect dated October 17, 2002 for the roundabout at Monarch Bay <br />Drive and Fairway Drive <br />This agreement supersedes the agreement dated November I7, 2003 between BMS Design <br />Group and the City of San Leandro. <br />Task I: Community Outreach: Refinement and Revision of Concept Design <br />During this Task, the concept design established in the Connections Plan will be reviewed with <br />various city departments and the community. The concept design will be revised as necessary to <br />address community needs as well as known budget constraints. <br />Task I1: Project Kick-off Meeting <br />A "kick-off 'meeting will be held with City staff to review the design concepts proposed in the <br />Connections Plan and discuss potential technical issues, programmatic and design revisions, <br />project scope, and scheduling. <br />Task L2: Community Outreach Meeting <br />The City will notify all property/business owners within and adjacent to the project area, <br />community interest groups, and organizations that have particular interest in the project outcome. <br />Owners and other interested parties will be invited to attend an informational meeting, during <br />which the City and members of the Contractor will provide an update on the current scope of <br />work and project schedule. Property and business owners will be asked to identify issues and <br />opportunities to be addressed as the project moves into final stages of design documentation. <br />Task II Client Meetings <br />Regular meetings will be held with the City staff to review project progress and address issues <br />that arise during the course of the work. Four scheduled Client meetings will be held, at monthly <br />intervals or as determined by the final project schedule. The project will commence with a <br />kickoff meeting to finalize the scope of work, schedule and budget for the project. <br />Task III Topographic Survey <br />An aerial topographic survey will be prepared with cone-foot contour interval along an <br />approximately 800-foot wide strip within the project area, centered on the centerline of existing <br />Monarch Bay Drive, at a scale of 1" = 20'. The Contractor will compile information on the base <br />maps that is vital to project planning, design, and ultimate construction of improvements. This <br />task will be conducted concurrently with the early stages of Tasks I, N, and V. <br />Amended Contractual Services Agreement /BMS Page 3 of 19 <br />Monarch Bay Drive/Fairway Drive to Marina Boulevard Project No. 120-38-2a3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.