Laserfiche WebLink
D. GRADING, EROSION AND POST-CONSTRUCTION CONTROLS <br />1. Prior to any grading operations, the subdivider shall submit all information <br />including a Grading Plan accompanied by Soils Engineering and Engineering <br />Geology Reports, in accordance with requirements of the City of San Leandro <br />Municipal Code Title VII, Chapter 12 and obtain a grading permit. <br />2. To control storm water pollution, the subdivider shall comply with the regulations <br />and provisions contained in the City's Grading Ordinance, the City's Storm Water <br />Pollution Prevention Permit, and the National Pollutant Discharge Elimination <br />System (NPDES), to the satisfaction of the City Engineer. <br />3. Until such time as all construction for the development has been completed to the <br />satisfaction of the City Engineer, the subdivider shall provide current Erosion & <br />Sediment Control Plans, and amended Storm Water Pollution Prevention Plans <br />(SWPPPs) for all portions of the site where construction is ongoing. Said Plans <br />shall be submitted to the City Engineer for review and approval on or before <br />September 1 of each calendar year, and shall be fully implemented on or before <br />October 15 of each calendar year. <br />4. During construction the following high standards for sanitation are required: <br />Garbage cans, construction dumpsters, and debris piles shall be removed on a <br />minimum weekly basis. All food related trash items such as wrappers, cans, <br />bottles, and food scraps shall be disposed of in closed containers only and shall be <br />regularly removed from the site. Inspections, conducted as part of the regular <br />construction compliance, will be conducted to ensure compliance of the subdivider <br />and contractors with this requirement. <br />5. All on-site storm drain inlets must be labeled "No Dumping-Drains to Bay" using <br />approved methods. <br />E. WATER SYSTEM <br />1. Water service is currently available along Hesperian Boulevard. The subdivider <br />shall submit plans approved by EBMUD showing the water service extension, <br />network analysis and looping requirements. <br />2. On site EBMUD street fire hydrants with minimum fire flow and spacing in <br />accordance with the San Leandro Uniform Fire Code will be required. Prior to <br />installation, the Fire Department shall approve the location of the fire hydrants. A <br />water supply and hydrants shall be in place prior to combustible material being <br />moved into any phase of the project to the satisfaction of the Fire Department. <br />City Engineer's Report Page 5 of 7 Tract Map 7413 <br />