Laserfiche WebLink
PROJECT DESCRIPTION <br />PROJECT LOCATION <br />The Dredged Material Management Site (DMMS) is located near the western bayfront of the City <br />of San Leandro in the vicinity of Roberts Landing (see Tigure 1). The DMMS is bordered on the <br />west and southwest by the Monarch Bay Golf Club (formerly Tony Lema Golf Course). San <br />Francisco Bay is located beyond the golf course to the west of the project site. Estudillo Canal, a <br />flood control channel that drains into the Bay and is managed by the Alameda County Flood <br />Control and Water Conservation District, is located to the north of the site; the Marina Faire <br />residential area is located beyond the canal to the northwest; and industrial and commercial uses <br />are located across the canal to the northeast. Land owned by the State Lands Commission is <br />located to the southwesC of the DMMS and the Citation Homes Central, Inc. residential <br />development is located to the southeast. The Southern Pacific Railroad and the Marina Vista <br />residential development are located to the east of the project site (see Figure 2). <br />The 100-acre DMMS currently consists of two enclosed basins where dredged material from the <br />San Leandro Marina and entrance channel is periodically deposited and dried. The West Basin <br />(Basin 1), in the western portion of the DMMS, consists of approximately 37 acres and the East <br />Basin (Basin 2) encompasses the remainder of the site. The DMMS is surrounded by levees and <br />contains four existing weirs through the northern levee along Estudillo Canal and one internal <br />weir. These weirs control decant drainage. A central levee, running roughly south to north, <br />divides the DMMS into the two basins described above, with a "training" levee further dividing <br />the East Basin. A tidal weir is present in the southern levee of the West Basin. This weir enables <br />tidal waters from the adjacent Shoreline Marshlands Enhancement Project to enter the DMMS, <br />once the deposited sediments in the West Basin are removed. <br />PURPOSE OF THE PROTECT <br />In compliance with Regional Water Quality Control Board (RWQCB) Order Nu. 90-013 and <br />upon subsequent direction from RWQCB, the City plans to remove dredged materials recently <br />placed at the DMMS during maintenance dredging in 2001 of the San Leandro Marina entrance <br />channel and the San Leandro Marina yacht club and fuel dock areas. The Management Plan for <br />the DMMS specifies that the site should be managed for the overall purpose of further enhancing <br />its value as shorebird habitat consistent with its primary function of dredged material storage. <br />More specifically, the Management Plan provides for "minimizing the adverse impacts to the <br />wetland habitat values of the site consistent with dredged material handling by planning dredging <br />projects to impact the smallest area of the site and by drying the dredged material in the least <br />amount of time and area." In addition, the plan provides for: <br />• seasonal and/or muted tidal water areas suitable for shorebird use, including establishment <br />of an invertebrate food source in the water areas. <br />San Leandro DMMS 1 March / 2004 <br />Sediment Removal Project <br />