My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2004-082
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2004
>
Reso 2004-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2009 12:36:18 PM
Creation date
8/10/2009 11:05:05 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
6/7/2004
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1016-1052 Davis Street; Firehouse Office Center <br />PLN2004-00031 <br />DRAFT MITIGATION MONITORING PLAN <br /> MONITORING <br /> IMPACT MITIGATION REQUIRED RESPONSIBILITY TIMING <br /> <br />Geolo <br />3. a. and Soils <br />The site is located within a <br />As a standard condition of approval, the Uniform Building Code requires <br />Building Official Prior to issuance of building <br /> seismically active area. new building construction to meet requirements for construction in permits. <br /> earthquake-prone areas, which is intended to minimize any potential <br /> impacts related to seismic events. <br />H drolo and Water Quali <br />4. e. The construction phase of Until such time as all construction for the development has been City Engineer Yearly on or before <br />September 1 for the duration <br /> development will require completed to the satisfaction of the City Engineer, the applicant shall <br /> grading of the site, which may provide current Erosion & Sediment Control Plans, and amended of on-site construction <br /> result in impacts related to site Storm Water Pollution prevention Plans (SWPPPs) for all portions activities. <br /> hydrology and water quality. of the site where construction is ongoing. Said plans shall be <br /> submitted to the City Engineer for review and approval on or before <br /> September 1 of each calendar year, and shall be fully implemented <br /> on or before October 15 of each calendar year. <br />Hazards and Hazardous Materials <br /> <br />8. b. <br />and d. It is not known whether the <br />existing building, which will <br />• Any lead and/or asbestos-containing materials that maybe onsite <br />Chief Building Official and <br />Prior to issuance of grading <br /> be substantially renovated, shall be properly managed and disposed during construction Environmental Services or building permits. <br /> contains any asbestos or lead activities. Prior to issuance of grading permits, plans for removal and Division <br /> contamination (in the form of disposal of lead and asbestos containing materials (if found to be <br /> paint}. onsite) shall be reviewed and approved by the Chief Building <br /> Official and Environmental Services staff. <br />PLN2004-00031; Firehouse Office Center- Draft MMP Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.