My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2004 Winzler & Kelly Consulting Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2004
>
Agmt 2004 Winzler & Kelly Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2009 3:15:02 PM
Creation date
8/11/2009 9:09:01 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/7/2004
Retention
PERM
Document Relationships
Reso 2004-138
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Provide current billing expenses, as well as a running total of expenses, payments <br />received, invoices billed, and remaining balances on each purchase order. <br />• Provide an itemized invoice listing of billed reimbursable expenses, as well as a <br />running total of reimbursable expenses <br />• Reference project account number (961-86-045) as well as the purchase order <br />number as designated <br />2.5 Miscellaneous <br />• Unless specifically noted otherwise, all meetings with City Staff shall occur in <br />San Leandro City Hall located at 835 East 14th Street in San Leandro during <br />normal business hours. <br />3.0 PROJECT SPECIFIC SCOPE OF WORK AND DELIVERABLES <br />3.1 Develop Joint Trench Plan <br />Contractor shall use the joint trench plan developed for the West Estudillo Pedestrian <br />Connection project. Contractor shall update the West Estuillo Pedestrain Connection <br />projects plan accordingly to be consistent with the requirements of the utility companies <br />and completed "Form B" <br />3.2 Preparation of Utility Cross Sections <br />Contractor shall prepare utility cross sections far each different joint trench condition. <br />• Plans shall include applicable utility details and specifications. <br />• Define all utility companies involved <br />• Define the size and quantity of conduits each utility company desires <br />Deliverable: Five (5) copies each to each participating agency . <br />3.3 Preparation of "Form B" Authorization <br />Contractor to complete all "Form B" cost breakdown for all participating joint trench <br />occupants. Costs shall be latest construction costs: <br />• Define all utility companies involved <br />• Define the size and quantity of conduits each utility company desires <br />• Breakdown of costs with amounts attributable to all participating agencies. <br />• Revise Form B estimate with actual bid costs and construction costs. <br />Deliverable: Five (S) copies each to each participating agency . <br />3.4 Design Management and QA/QC <br />Contractor shall provide overall project management and maintain effective <br />communications with City staff and participating utilities throughout the duration of this <br />phase. Contractor to review and revise documents as necessary to meet the requirements <br />of the participating joint trench agencies and utilities. <br />Consulting Services Agreement between August 13, 2004 <br />City of San Leandro and Winzler and Kelly Consulting Engineers Page 15 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.