My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2004 Winzler & Kelly Consulting Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2004
>
Agmt 2004 Winzler & Kelly Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2009 3:15:02 PM
Creation date
8/11/2009 9:09:01 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/7/2004
Retention
PERM
Document Relationships
Reso 2004-138
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B-2 <br />REIMBURSABLES <br />Description of Reimbursable Expenses <br />Reimbursable expenses include costs of reproduction, mailing and shipping, long- <br />distance and cellular telephone calls, travel costs in connection with the project and <br />facsimile transmissions. Project reimbursables shall be expensed as follows: <br />^ Reimbursable expenses to be billed at one point one-two (1.12) times direct <br />expense. <br />^ Subconsultants to be billed at one point one-two (1.12) times direct expense. <br />^ consumables for routine in-house expenses are charged by the hour of labor as <br />indicated below and there is no markup on these items. <br />Out-of-Pocket Project Expenditures by Winzler & Kelly <br />Actual cost plus 15%. <br />Miscellaneous In-House Services <br />The cost of using equipment and specialized supplies is billed on the basis of employee hours <br />dedicated to projects. This method is less costly, but less precise, than billing on the basis of <br />"units of service." We strive to maintain fair and competitive rates, designed to recover our <br />investment in these items which bring increased efficiency to employee labor. Instead of billing <br />one rate with no regard to the types of projects, we have opted to apply four separate rates, such <br />that only those projects utilizing certain types of equipment are charged. Our rates are: <br />A. Office consumables $5.00/hr <br />B. Environmental Department consumables $10.00/hr <br />C. Survey consumables $10.00/hr <br />D. Environmental and Land Surveying equipment Various at market rate <br />Consulting Services Agreement between August 13, 2004 <br />City of San Leandro and Winzler and Kelly Consulting Engineers Page 19 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.