Laserfiche WebLink
AutoCAD 2002 formal The City will receive three sets of the 70% plans which <br />will include: <br />1. Cover Sheet <br />2. Layout/Survey Control <br />3. Demolition Plan <br />4. Utility Plan & Profile <br />5. Pavement Elevations <br />6. Electrical Plans <br />7. Electrical Details <br />8-10. Civil Details <br />1.2 70% Specifications -The Contractor shall prepare 70% Specifications. The <br />Specifications will be prepared in City's standard format using MS Word, and in <br />accordance with the Standard Specifications for Public Works Construction, (The <br />Green Book, latest edition). <br />1.3 Cost Estimate -The Contractor shall prepare a 70% cost estimate with an <br />estimated cost of construction broken down into standard bid items for all <br />elements shown on the 70% Plans. <br />1.4 Review Meeting -The Contractor shall provide 3 sets of the 70% Plans to the <br />City for review by and distribution to City departments. The City departments <br />shall review the 70% Plans and prepare comments for Contractor to incorporate <br />into the 100% Plans. <br />1.5 Utility/Agency Coordination -The Contractor shall submit exhibits to the utility <br />companies during the final design to continue the utility relocation process <br />Exhibits shall include all design information required by the utility companies in <br />order to relocate their utilities. In addition, Contractor shall schedule and attend <br />at least one project meeting with City, Alameda County and ACTIA to discuss the <br />preliminary design and coordination with Alameda County's ACTIA Project No. <br />13 - Lewelling/E. Lewelling Widening Project in San Lorenzo (Hesperian Blvd. <br />to Meekland Ave.). City will assist in scheduling meetings and provide meeting <br />place, if needed. <br />Task 2 -100% Design <br />2.1 100% Plans -The Contractor shall prepare 100% Plans. All sheets shall be <br />prepared as stated in 70% Plans. The City will receive 3 sets of the 100% plans. <br />2.2 100% Specifications -The Contractor shall prepare 100% Specifications. The <br />Specifications will be prepared in City's standard format using MS Word, and in <br />accordance with the Standard Specifications for Public Works Construction, (The <br />Green Book). <br />Contractual Services Agreement Phase 2 - Fina] Design Services Page 4 of 17 <br />Revised 5-02 Hesperian Blvd. and Lewelling Blvd. Widening Project, Project No. 03-144-39-002, ACTIA Project No. 17 <br />