My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Kennedy Jenks Consultants
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Kennedy Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 2:13:39 PM
Creation date
8/13/2009 4:49:29 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/17/2003
Retention
PERM
Document Relationships
Reso 2003-074
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />This is a supplemental agreement to the previous contract with Kennedy/Jerks for the upgrade of <br />Aeration Tank B. This work involves additional design services required for the upgrade of the <br />electrical system, provide flexible operation and control to the blowers in the two aeration tanks. <br />The scope of services are outlined under the following tasks <br />Additional Scope of Work -Electrical <br />1. Provide a control interlock with the inlet filter monitoring system to shut down the blower <br />when a high differential pressure condition is detected across the filter. <br />2. Provide a control interlock with the surge monitoring system to shut down the blower when a <br />high surge condition (low motor current) is detected. <br />3. Provide a 4-20 maDC signal for monitoring the Aeration Basin B dissolved oxygen (DO) <br />value at the Operations Building. This requires a new instrumentation cable to be installed in <br />existing conduits from the Fisher Porter (F&P) controller panel to the graphic panel in the <br />Operation Building. <br />4. Provide control interlocks for the three blowers to allow only two blowers to run at any one <br />time. Blowers will be manually selected to operate. This means that modifications to the <br />existing starter control circuit for Blower No. 1 will be required. <br />5. Upgrade the existing feeder to main control center (MCC) "K". <br />Additional Scope of Work -Process and Mechanical <br />Contractor shall incorporate in the design work changes in the process control strategy to provide <br />flexible operation and control of dual blowers. This will provide a blower control system that is <br />based on the dissolved oxygen level in either or both tanks and will control one or both blowers <br />in operation. <br />Each blower shall be started manually, and only two blowers will be operated at a time <br />Schedule <br />The same as original contract <br />Deliverables <br />Incorporate in original contract <br />Contractual Services Agreement Page 3 of 15 <br />Revised 5-02 Aeration Tank "B" Upgrade at WPCP <br />
The URL can be used to link to this page
Your browser does not support the video tag.