Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />Project involves replacing the existing playground areas at Halcyon Park with new facilities that <br />meet current CPSC and ADA requirements; as well as other ancillary improvements to site <br />furnishing, flatwork, landscaping, drainage and irrigation. <br />3.0 CONSTRUCTION DOCUMENTS <br />3.01 Format of Deliverables: All submittals described below shall conform to the following: <br />• All drawings shall be made available to the City of San Leandro in AutoCad2000 format. <br />• Specifications shall be prepared in Microsoft Word 2000 utilizing the APWA standard <br />specifications (The Green Book), 2003 edition. <br />• Details shall conform to the City of San Leandro Standard Plans where applicable. <br />3.02 35% Submittal: Prepare five copies of 35% complete construction documents with <br />layout of all major elements clearly defined. The specific drawing index will likely <br />include the following: <br />• cover sheet <br />• grading and drainage plan <br />• site construction plan <br />• playground area enlargement plari and details <br />• lighting plan <br />• detail drawings for all of the above <br />• ~ irrigation plan and details <br />• planting plan and details <br />• outline of technical specifications <br />• estimate of probable construction costs <br />Submit above to City staff for review and comment; conduct joint meeting with City <br />departments to facilitate review. <br />3.03 70% and 100% Submittals: Prepare five copies of separate 70% and 100% submittal <br />packages of construction documents incorporating comments received on design <br />development submittal, along with an estimate of probable construction cost in bid form <br />.format. <br />3.04 Staff Meeting: Allow for one staff meeting at the 7.0% submittal and another at the 100% <br />submittal similar to task 2.04. <br />3.05 Final Plans, Specifications and Estimate: Provide City with one hard copy of plans, <br />specifications, and cost opinion. Drawings to be vellum, signed and stamped by all <br />consultants as applicable <br />City's use in bidding. <br />CSA.-Callander Associates <br />I~alcyon Park l~enovatior. <br />Also include one electronic copy of the final documents for <br />Page 3 of 14 <br />Project Nos. 210-43-190, 210-69-197 <br />