Laserfiche WebLink
4 Qffice of Library Construction Title 2A Application Chec~list <br />E~®nd Act Grant f~acipient Subrnittaf Checkf ist <br />f:in~! Review ®f Gons$ructi®n i~ocurv~e:-ots ®etaii Check9ist <br />For CSC Use: <br />Reviewed by:_ <br />Date: <br />Project Number: <br /> Grant <br />Recipient State Library <br /> Use <br />U <br />S <br />BMITTAL REGtl11REMElVTS NOTES <br /> Included in Received in <br /> Submittal? Submittal? <br /> YE5 NO YES NO <br />C'ne (1) Final Copy of Complete $tamped and Signed <br />Plans Specifications [~ ^ ~ [] <br />Section 16-703 Ck), . 7 <br />-One (1) Copy of AlI Supporting Documents Required <br />' <br />Secfion 16- <br />03 (b)C2), . 4 <br />OLC Comments from'Gonstruction Documents <br />" <br />inco.~porated <br />into submittal? <br />1 Complete set of construction bid documents <br />2 Local code compliance reviews and approvals <br /> documented on tans <br />3 All drawing sheets stamped by architect or ~ ~ ~ i <br /> a ro riate en ineer <br />4 All drawing sheets signed by architect or appropriate <br /> en ineer <br />5 Specifications cover stamped by architect <br />6 Specfcations cover signed by architect <br />7 DSA access compliance approval documentation <br />Final Review of Construction Documents Detail Checklist Page 1 of 1 1216102 <br />