Laserfiche WebLink
F~ ft <br />~~ 200-0~ ~~P~~~ ~MP~.~vv~M~~a~ ~~.~~~~~~~ <br />_,~_~ <br />~-~ ~,_ <br />~~~ <br />~~`~ ? `~ ~ <br />$ud6ef Estimate: _., _, _ _ ~y_ :! <br />oN~E~~ ~ <br />~lep€~F <br />Project Seope: This project includes replacement of the existing play structure at <br />Bonaire Park to meet ADA requirements and install new ramping <br />and surfacing. <br />The scope of work far this project consists of the following tasl~s: <br />i . Upgrade the existing playground area to comply with ADA <br />_~ requirements that include providing new play equipment for <br />children of ages 5-12, concrete curb around the area and ramp <br />~~ leading up to the accessible route of travel, similar to the south <br />end of Marina Park play equipment. <br />2. Construct accessible pathways to existing picnic and play areas <br />~"! <br />3. Install accessible picnic tables and barbecues. <br />~_. '~ <br />4. .Expand parkin, lot by 9000 sq ft and upgrade park entry. <br />~~ <br />r ~ ~~x~~ <br />t,~~ 5. Install shade trees around paa-king lot, at the. islands and at the <br />.~ picnic areas. <br />6. Install imgation for the new shade trees around parl~ixig lot and <br />at the islands. <br />7. Remove and replace the=.concrete pads under the existing picnic. <br />tables. <br />8. Two meetings with neighborhood by Landscape Architect <br />Jurisdictional CEQA <br />Clearance: <br />Wok l: Force: Constl-uction documents for this project to be completed by ara <br />outside contractor as part of the 2003-04 CIP process. Construction <br />work to be done by an outside contractor. <br /> <br />