My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2003-090
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2003
>
Reso 2003-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2009 10:22:34 AM
Creation date
8/14/2009 10:19:49 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/7/2003
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F~ ft <br />~~ 200-0~ ~~P~~~ ~MP~.~vv~M~~a~ ~~.~~~~~~~ <br />_,~_~ <br />~-~ ~,_ <br />~~~ <br />~~`~ ? `~ ~ <br />$ud6ef Estimate: _., _, _ _ ~y_ :! <br />oN~E~~ ~ <br />~lep€~F <br />Project Seope: This project includes replacement of the existing play structure at <br />Bonaire Park to meet ADA requirements and install new ramping <br />and surfacing. <br />The scope of work far this project consists of the following tasl~s: <br />i . Upgrade the existing playground area to comply with ADA <br />_~ requirements that include providing new play equipment for <br />children of ages 5-12, concrete curb around the area and ramp <br />~~ leading up to the accessible route of travel, similar to the south <br />end of Marina Park play equipment. <br />2. Construct accessible pathways to existing picnic and play areas <br />~"! <br />3. Install accessible picnic tables and barbecues. <br />~_. '~ <br />4. .Expand parkin, lot by 9000 sq ft and upgrade park entry. <br />~~ <br />r ~ ~~x~~ <br />t,~~ 5. Install shade trees around paa-king lot, at the. islands and at the <br />.~ picnic areas. <br />6. Install imgation for the new shade trees around parl~ixig lot and <br />at the islands. <br />7. Remove and replace the=.concrete pads under the existing picnic. <br />tables. <br />8. Two meetings with neighborhood by Landscape Architect <br />Jurisdictional CEQA <br />Clearance: <br />Wok l: Force: Constl-uction documents for this project to be completed by ara <br />outside contractor as part of the 2003-04 CIP process. Construction <br />work to be done by an outside contractor. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.