Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 6 FINANCE <br />Chapter 4 Fees <br />2003-04 <br />Adopted <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Adnunistrative <br />Code (SLAG) or the general laws of the State of California. <br />Descri tion C~urent Fee Reference <br />COMMCJNITY DEVELOPMENT DEPARTMENT -Building Regulations Division <br />1. Plans and Specifications See Engineering & Transportation Department <br />Item 9. Public Work Projects <br />2. Building Permit <br />NOTE: FEES FOR BUILDING PERMITS AND TERMITE REPAIR WORK DO NOT INCLUDE THE STRONG <br />MOTION (EARTHQUAKE) INSTRUMENTATION PROGRM (S.M.LP.) FEE MANDATED BY THE STATE OF <br />CALIFORNIA AND COLLECTED BY THE CITY FOR THE STATE. THIS FEE MUST BE ADDED TO THE <br />PERMIT FEES. <br />a. Issuance Fee $23.00 plus total valuation fee, as listed below <br />Minimum fee for one inspection $50.00 <br />Building Pernuts requiring more than one $114.00 <br />inspection, other than for those requiring return <br />inspections for corrections from a previous <br />inspection, have a minimum fee of: <br /> <br />All-Inclusive Permit: Work involving a _. <br />.One issuance fee plus <br />combination of building and/or mechanical, One permit fee plus <br />electrical and plumbing, with a value of less than Items from respective fee tables <br />$3,000: <br />(Note: The Building Official may adjust the plan checking/pemut fee for an individual project when costs to the <br />City are not congment with this fee schedule.) <br />_.. _ _ <br />04/07/03 5 <br />