Laserfiche WebLink
14. USE O F R ECYCLED P RODUCTS. C ontractors s hall p repare a nd s ubmit all reports, <br />written studies and other printed material on recycled paper to the extent it is available at <br />equal or less cost than virgin paper. <br />I5. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design specifications, and <br />each page of construction drawings shall be stamped/sealed and signed by the licensed <br />professional responsible for the report/design preparation. The stamp/seal shall be in a <br />black entitled "Seal and Signature of Registered Professional with report/design <br />responsibility" as per sample below. <br />Cherry Grove Park Playground Renovation Page 17 of 24 <br />Contractual Services Agreen~e-zit Project Na, 150-69-195 <br />