Laserfiche WebLink
probable project cost. Report shall be typed with a computer word processor; the <br />file shall be compatible with Microsoft Word. <br />3.0 Schedule <br />90% draft of report 8 weeks from Notice to proceed <br />Final report 2 weeks from receipt of comments on 90% draft <br />4.0 Exclusions <br />Material testing <br />Exploratory demolition <br />Detailed analysis <br />Public Works Seismic Study Page 4 of I S <br />Merovich CSA Project No. 210-18-117 <br />