My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Glass Architects
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Glass Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2009 1:12:59 PM
Creation date
8/14/2009 1:12:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/5/2003
Retention
PERM
Document Relationships
Reso 2003-112
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. COMPLIANCE WITH APPLICABLE LAWS. Contractor shall comply with all laws <br />applicable to the performance of the work hereunder, including, but not limited to, laws <br />prohibiting discrimination based on race, religious creed, color, national origin, ancestry, <br />physical handicap, medical condition, marital status or sex. <br />14. USE OF RECYCLED PRODUCTS. Contractors shall prepare and submit all reports, <br />written studies and other printed material on recycled paper to the extent it is available at <br />equal or less cost than virgin paper. <br />15. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design specifications, and <br />each page of construction drawings shall be stamped/sealed and signed by the licensed <br />professional responsible for the report design preparation. The stamp/seal shall be in a <br />block entitled "Seal and Signature of Registered Professional with report/design <br />responsibility" as per sample below. <br />~~ ~~~,~ <br />~,~ a~u. I o 3 ~. <br />Seal and Sign~r~of Registered Professional <br />with report/design responsibility <br />CSA Glass Architects Pagel 8 of 1 S <br />Boys & Girls Club Pool Project No. ] 50-69-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.